IFB Replace Vehicle Exhaust Extraction System, San Leandro, California ¿ Alameda County
Federal opportunity from Department of Transportation. Place of performance: CA. Response deadline: Mar 26, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 130 more rate previews.↓
Point of Contact
Agency & Office
Description
Contractor agrees to provide to the California Department of Transportation (Caltrans) all labor, materials, tools, equipment, travel, supplies, parts, fees, permits, and incidentals necessary to remove and legally dispose of the current Exhaust Evacuation System (EES) and furnish and install a new EES including motors, reels, switches, ducting, wiring and all other components. The services shall be performed at Caltrans District 32 Equipment Shop 4 (Weld Shop and Shop C sections 1 and 2) located at 1993 Marina Boulevard, San Leandro, CA 94577, Alameda County. The documents and files attached to this solicitation do not have any updates for digital accessibility at this time. Updates will be applied as soon as they are available. For an accessible version of solicitation documents published on this page, please submit a request to ADAdocs@dot.ca.gov or call (833) 713-2922.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.