Swinerton Invitation for Prequalification of Qualified Subcontractors and Suppliers: Doors, Frames, and Hardware (DFH)
Federal opportunity from Bakersfield • CSU, Bakersfield. Place of performance: CA. Response deadline: Feb 28, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
SWINERTON INVITATION FOR PREQUALIFICATION Qualified Subcontractors & Suppliers Requested Collaborative Design-Build Agreement for the Energy and Innovation Building CSU Bakersfield Campus 9001 Stockdale Hwy, Bakersfield CA 93311 DUE DATE FOR PREQUALIFIACTIONS: Requesting completed prequalification forms from subcontractors by February 27, 2026 OUTREACH GOALS: 6% DVBE Requirement PROJECT INFORMATION AND DESCRIPTION: The project consists of the design and construction of a new multi-story Science Building of approximately 56,500 GSF. The new Energy Innovation Building will include a combination of offices, research laboratories, teaching labs, a capstone design laboratory, and a versatile flex-design event space. Additionally, the scope encompasses the creation of flexible outdoor spaces that provide dynamic areas for engagement and interaction. This project is a collaborative design-build and falls under Public Works and Prevailing Wage regulations. Deadline for Pre-Qualification packages: 2/27/26 Anticipated Trade Bid Packages Posted date: 3/13/26 Estimated Construction Start Date: 01/01/26 Estimated Construction Completion Date: 06/16/27 DOCUMENTS: https://swinerton.com/subcontractor-prequalification/ TRADES: Doors, Frames, and Hardware (DFH) REQUIRED SUBMITALS: Swinerton Builders Prequalification Swinerton Master Service Agreement (MSA) Interested in prequalifying, please contact the Swinerton Prequalification Team at: subcontractorprequal@swinerton.com See Full Ad Attached
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.