Skip to content
Kuna School District

Instructions on Proposal Submission

Solicitation: Not available
Notice ID: dcd1e31e5fe2e1727c0c9f42fa2aad70
DepartmentKuna School DistrictStateIDPostedMar 03, 2026, 12:00 AM UTCDueNo due date posted

Federal opportunity from Kuna School District. Place of performance: ID.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,980,125,018
Sector total $2,980,125,018 • Share 100.0%
Live
Median
$158,160
P10–P90
$32,032$3,760,041
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,980,125,018)
Deal sizing
$158,160 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for ID
Live POP
Place of performance
Kuna, ID
State: ID
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 23, 2026
Idaho • Ada
LINE CONSTRUCTION (Lineman)
Base: $51.02 • Fringe: $17.93
POWER EQUIPMENT OPERATOR (Crane)
Base: $36.98 • Fringe: $20.50
POWER EQUIPMENT OPERATOR (Backhoe/Excavator/Trackhoe)
Base: $36.14 • Fringe: $16.10
Match signal: state match
Published Jan 23, 2026
Idaho • Boise, Canyon, Gem +1
LINE CONSTRUCTION (Lineman)
Base: $51.02 • Fringe: $17.93
POWER EQUIPMENT OPERATOR (Crane)
Base: $36.98 • Fringe: $20.50
POWER EQUIPMENT OPERATOR (Backhoe/Excavator/Trackhoe)
Base: $36.14 • Fringe: $16.10
Match signal: state match
Published Jan 23, 2026
Idaho • Canyon, Gem
BRICKLAYER
Base: $35.53 • Fringe: $19.85
POWER EQUIPMENT OPERATOR Forklift
Base: $36.33 • Fringe: $15.40
Loader
Base: $36.14 • Fringe: $16.10
Match signal: state match
Published Jan 23, 2026
Idaho • Ada, Boise
BRICKLAYER
Base: $35.53 • Fringe: $19.85
POWER EQUIPMENT OPERATOR Forklift
Base: $36.33 • Fringe: $15.40
Loader
Base: $36.14 • Fringe: $16.10
Match signal: state match

Point of Contact

Not available

Agency & Office

Department
Kuna School District
Agency
Not available
Subagency
Not available
Office
Purchasing
Contracting Office Address
Not available

Description

Instructions on Proposal Submission

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.