Third Street NW Complete Street Project - LAP
Federal opportunity from City of Winter Haven. Place of performance: FL. Response deadline: Feb 17, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
<p>The City of Winter Haven is seeking firms interested and qualified to construct a Complete Street Project (LAP) on our behalf.<br><br>Scope of Work: The project corridor extends along 3rd Street NW from Avenue D to South Lake Silver Drive. The planned complete street improvements encompass modifications to both horizontal and vertical roadway geometry, incorporation of a variable-width median, reconfiguration of on-street parking, construction of drainage swales, and installation of 8-foot sidewalks on both sides of the roadway. The design includes a conventional roundabout at the Avenue E NW and a peanut-shaped roundabout at the Avenue F NW intersection. The scope of work also includes upgrades to sidewalks, pedestrian crossings, lighting, signage, pavement markings, and on street parking.<br> </p>
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.