1899-26 (RFP) Design Services for Goodwin Elementary School Unit Ventilator Rep
Federal opportunity from State of CT - DAS Procurement • East Hartford Public Schools. Place of performance: CT. Response deadline: Feb 02, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
East Hartford Public Schools (EHPS) is seeking proposals from qualified engineering firms for a project to replace the existing unit ventilators at Goodwin Elementary School, 1235 Forbes St, East Hartford, CT. The scope of design services shall consist of all work including, but not limited to, demolition and removal of the existing pneumatically controlled horizontal unit ventilators (heat only) original to the building and replacing them with new and efficient hot water ventilators with electronic controls. The design will also include controls that will communicate to the existing BMS. Proposals are being sought from licensed and experienced mechanical engineering firms to provide construction design and construction administration services.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.