Skip to content
Department of Transportation

T32-D7-PCC-District Wide- 184834

Solicitation: Not available
Notice ID: d62c31ceb3e22ebe9f24abefff2cd585
DepartmentDepartment of TransportationStateGAPostedMar 03, 2026, 12:00 AM UTCDueMar 18, 2026, 09:00 PM UTCCloses in 15 days

Federal opportunity from Department of Transportation. Place of performance: GA. Response deadline: Mar 18, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,980,125,018
Sector total $2,980,125,018 • Share 100.0%
Live
Median
$158,160
P10–P90
$32,032$3,760,041
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,980,125,018)
Deal sizing
$158,160 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Georgia
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 23, 2026
Georgia • Richmond
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base: $33.90 • Fringe: $18.80
ELECTRICIAN
Base: $32.25 • Fringe: $16.95
POWER EQUIPMENT OPERATOR: Backhoe/ Excavator/ Trackhoe
Base: $33.00 • Fringe: $17.70
Match signal: state match
Published Jan 23, 2026
Georgia • Murray, Whitfield
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base: $30.24 • Fringe: $18.54
ELECTRICIAN
Base: $35.35 • Fringe: $14.63
OPERATOR: Crane
Base: $38.53 • Fringe: $16.08
Match signal: state match
Published Jan 23, 2026
Georgia • Bryan, Chatham, Effingham
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base: $33.90 • Fringe: $18.80
ELECTRICIAN
Base: $33.35 • Fringe: $13.40
OPERATOR: Crane
Base: $38.53 • Fringe: $16.08
Match signal: state match
Published Jan 23, 2026
Georgia • Muscogee
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base: $33.90 • Fringe: $18.80
OPERATOR: Crane
Base: $38.53 • Fringe: $16.08
OPERATOR: Forklift
Base: $32.93 • Fringe: $16.08
Match signal: state match

Point of Contact

Not available

Agency & Office

Department
Department of Transportation
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Description

T32-D7-PCC-District Wide- 184834

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.