Skip to content
Connecticut Airport Authority

Parking Lot Reconstruction and Utility Improvements - GON

Solicitation: Not available
Notice ID: d5c661e9d70d26b57c4f2e9dbc08753d
DepartmentConnecticut Airport AuthorityAgencyState of CT - DAS ProcurementStateCTPostedMar 11, 2026, 12:00 AM UTCDueFeb 10, 2026, 01:49 PM UTCExpired

Federal opportunity from State of CT - DAS Procurement • Connecticut Airport Authority. Place of performance: CT. Response deadline: Feb 10, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$386,765,285
Sector total $386,765,285 • Share 100.0%
Live
Median
$129,570
P10–P90
$32,637$689,094
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($386,765,285)
Deal sizing
$129,570 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for CT
Live POP
Place of performance
Hartford, CT
State: CT
Contracting office
450 Columbus Boulevard, Suite 1202 • Hartford, CT • 06103 United States

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
CT20260020 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Connecticut • Fairfield
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $48.81Fringe $33.65
Rate
BRICKLAYER
Base $45.56Fringe $37.97
+31 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 31 more rate previews.
Davis-BaconBest fitstate match
CT20260020 (Rev 1)
Open WD
Published Jan 23, 2026Connecticut • Fairfield
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $48.81Fringe $33.65
Rate
BRICKLAYER
Base $45.56Fringe $37.97
Rate
CEMENT MASON/CONCRETE FINISHER
Base $45.56Fringe $37.97
+30 more occupation rates in this WD
Davis-Baconstate match
CT20260024 (Rev 1)
Open WD
Published Jan 23, 2026Connecticut • New London
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $48.81Fringe $33.65
Rate
BRICKLAYER
Base $45.56Fringe $36.94
Rate
CEMENT MASON/CONCRETE FINISHER
Base $45.56Fringe $36.94
+22 more occupation rates in this WD
Davis-Baconstate match
CT20260026 (Rev 1)
Open WD
Published Jan 23, 2026Connecticut • Windham
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $48.81Fringe $33.65
Rate
BRICKLAYER
Base $45.56Fringe $36.94
Rate
CEMENT MASON/CONCRETE FINISHER
Base $45.56Fringe $36.94
+22 more occupation rates in this WD
Davis-Baconstate match
CT20260008 (Rev 1)
Open WD
Published Jan 23, 2026Connecticut • Hartford
Rate
ELEVATOR MECHANIC
Base $66.72Fringe $38.43
Rate
POWER EQUIPMENT OPERATOR: Backhoe/Excavator 2 cubic yards and over
Base $51.92Fringe $29.80
Rate
Backhoe/Excavator under 2 cubic yards; Rubber Tire Backhoe/Excavator
Base $52.92Fringe $29.80
+18 more occupation rates in this WD

Point of Contact

Name
Kevin Lynch Connecticut Airport Authority Windsor
Email
procurement@ctairports.org
Phone
Not available

Agency & Office

Department
Connecticut Airport Authority
Agency
State of CT - DAS Procurement
Subagency
State of CT - DAS Procurement
Office
CTsource / DAS Procurement
Contracting Office Address
450 Columbus Boulevard, Suite 1202
Hartford, CT
06103 United States

Description

The project consists of: the reconfiguration and construction of an approximate 130-space surface parking lot in front of the terminal building. The project includes the reclamation of the access road and approximately 70,000 square feet of the existing parking lot. New bituminous concrete pavement will be placed on the reclaimed surfaces. The remaining paved parking area will be permanently removed and replaced with grass. The project also consists of curbing, drainage, utilities (water, sewer and gas) site lighting, landscaping, EV charging stations and other site amenities. The contract time for completion of all work is within One-Hundred and Eighty (180) calendar days from the date specified in the “Notice to Proceed”.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.