Replacement Air Compressors at the Argo Water Facility
Federal opportunity from - • CDPHE - Department of Public Health and Environment. Place of performance: CO. Response deadline: Mar 03, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Modification #2 - Addition of Modified Appendix H adding a vendor to the approved manufacturer list. All else remains the same. Modification #1 - Add Appendix J Optional Site Visit Information document. All else remains the same. The State of Colorado Department of Public Health and Environment, CDPHE, is soliciting bids from qualified contractors for the Replacement Air Compressors at the Argo WTF project. The two air compressors and compressed air storage system at the Argo WTF supply air to the reaction tank to assist in treatment of acid mine drainage from the Argo Tunnel in Idaho Springs, Colorado. The facility operates 24/7 and treatment will continue during construction. Occasional shutdown of the treatment is acceptable for startup of the new equipment. The single point is Kristi Gamble. Email: kristi.gamble@state.co.us.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.