Addendum 2 BDC18-25/26 Manatee Springs - Connect to the Municipalities
Federal opportunity from Department of Environmental Protection. Place of performance: FL. Response deadline: Mar 03, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
<p><strong>February 6, 2026</strong></p><p> </p><p><strong>NOTICE TO APPLICANTS</strong></p><p><strong>ADDENDUM NO. TWO (2)</strong></p><p> </p><p><strong>Manatee Springs State Park - Connect to the Municipalities</strong></p><p><strong>DEP BID NO. BDC18-25/26</strong></p><p> </p><p> </p><p> TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.</p><p> </p><h3>NOTICE</h3><p> </p><p>It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Logan Lee-Marple, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.</p><p> </p><p>_______________________________________</p><p>Signature of Contractor and Date</p><p> </p><p><strong>The following statements supersede & supplement the corresponding items in the specifications & drawings:</strong></p><p> </p><p>The revised plans and Septic Report are hereby incorporated into the bid package and supersede those originally posted with the bid documents. The revised bid package can be found at (<a href="https://publicfiles.dep.state.fl.us/DRP/BDC/BDC%20Public%20Files%20FY25-26/BDC18-25-26_Manatee_Springs_-_Connect_to_the_Municipalities/">https://publicfiles.dep.state.fl.us/DRP/BDC/BDC%20Public%20Files%20FY25-26/BDC18-25-26_Manatee_Springs_-_Connect_to_the_Municipalities/</a>). Please contact the Bureau of Design and Construction’s Contracts Section at <a href="mailto:Logan.LeeMarple@FloridaDEP.gov">Logan.LeeMarple@FloridaDEP.gov</a> with any questions.</p><p> </p><p><strong>1. Question: </strong>On the restroom / concession stand system, page C104 of</p><p>the plans, it calls for a 10’ deep 4’ diameter wet well. Is there any more detail on this particular structure? Can a pump tank meeting FAC 62-6 be utilized? </p><p> </p><p><strong>Answer: </strong>Please see the attached updated plans at: <a href="https://publicfiles.dep.state.fl.us/DRP/BDC/BDC%20Public%20Files%20FY25-26/BDC18-25-26_Manatee_Springs_-_Connect_to_the_Municipalities/">https://publicfiles.dep.state.fl.us/DRP/BDC/BDC%20Public%20Files%20FY25-26/BDC18-25-26_Manatee_Springs_-_Connect_to_the_Municipalities/</a> which provide more details on the Restroom Concession Lift Station (Sheets C104</p><p>and C503). Any variations from design plans will be reviewed during</p><p>the construction phase as shop drawings.</p><p> </p><p><strong>2. Question: </strong>Are tree protection barriers required?</p><p> </p><p><strong>Answer: </strong>Not required by Levy County.</p><p> </p><p><strong>3. Question: </strong>Are tanks to be traffic rated?</p><p> </p><p><strong>Answer: </strong>The tanks will not be installed in locations subject to</p><p>vehicular traffic loading. Accordingly, the tanks are not required to</p><p>be rated for traffic loads.</p><p> </p><p> </p><p>In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.</p>
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.