Skip to content
Ben Franklin Transit

Subcontractor Bid Invitation: Discovery Road / 19th St & Sheridan Street Bicycle & Pedestrian Safety, City of Port Townsend, WA

Solicitation: Not available
Notice ID: cc3f3c54ebf32d63caaec6ed58ca861e
DepartmentBen Franklin TransitStateWAPostedFeb 20, 2026, 12:00 AM UTCDueMar 19, 2026, 12:00 AM UTCCloses in 6 days

Federal opportunity from Ben Franklin Transit. Place of performance: WA. Response deadline: Mar 19, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$386,765,285
Sector total $386,765,285 • Share 100.0%
Live
Median
$129,570
P10–P90
$32,637$689,094
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($386,765,285)
Deal sizing
$129,570 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
WA, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
WA20260035 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Washington • Okanogan
Rate
BRICKLAYER
Base $33.95Fringe $19.33
Rate
TILE SETTER
Base $29.86Fringe $13.95
+37 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 37 more rate previews.
Davis-BaconBest fitstate match
WA20260035 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Okanogan
Rate
BRICKLAYER
Base $33.95Fringe $19.33
Rate
TILE SETTER
Base $29.86Fringe $13.95
Rate
CARPENTER (Drywall Hanging and Form Work Only)
Base $44.21Fringe $17.28
+36 more occupation rates in this WD
Davis-Baconstate match
WA20260021 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Adams
Rate
BRICKLAYER
Base $33.95Fringe $19.33
Rate
TILE SETTER
Base $29.86Fringe $13.95
Rate
CARPENTER (Including Drywall Hanging and Form Work)
Base $44.21Fringe $17.28
+28 more occupation rates in this WD
Davis-Baconstate match
WA20260033 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Lincoln
Rate
BRICKLAYER
Base $33.95Fringe $19.33
Rate
TILE SETTER
Base $29.86Fringe $13.95
Rate
CARPENTER (Including Drywall Hanging and Form Work)
Base $44.21Fringe $17.28
+27 more occupation rates in this WD
Davis-Baconstate match
WA20260025 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Garfield
Rate
BRICKLAYER
Base $33.95Fringe $19.33
Rate
TILE SETTER
Base $29.86Fringe $13.95
Rate
CARPENTER (Including Drywall Hanging and Form Work)
Base $44.21Fringe $17.28
+26 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Ben Franklin Transit
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

Subcontractor Bid Invitation: Discovery Road / 19th St & Sheridan Street Bicycle & Pedestrian Safety, City of Port Townsend, WA INTERWEST CONSTRUCTION, INC. would appreciate receiving a bid from your firm for this Project. We are an equal opportunity employer and request bids from all subcontractors including disadvantaged, minority, women, and disabled veterans and emerging small business enterprises. Discovery Road / 19th St & Sheridan Street Bicycle & Pedestrian Safety, City of Port Townsend, WA DBE Goal 8% The Discovery Rd/19th St & Sheridan St Bicycle & Pedestrian Safety project includes the following work: construct full depth asphalt pavement, planing, and asphalt overlay on Discovery Road and 19th Street; remove existing storm pipe and drainage structure; construct storm pipe and drainage structures; remove existing sidewalk, curb ramps, and curbs; construct curb ramps and sidewalk, and construct detectable warning strips; remove old signs; construct new signs; and construct pavement markings; and construct bike lane delineators. The work will also include traffic control, temporary pedestrian route maintenance, and coordination with the City for construction sequencing. Plans and Specifications: Discovery Road / 19th St & Sheridan Street Bicycle & Pedestrian Safety, City of Port Townsend, WA Please send quotes to bids@interwest.biz by Thursday, March 19th, 2026 at 12:00 PM. Closing Date: Thursday, March 19, 2026Organization: Interwest Construction, Inc. Point of Contact: Sarah Freeland - bids@interwest.biz

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.