Skip to content
Department of Transportation

iCX Construction Management System

Solicitation: Not available
Notice ID: c3fcd538c8ae54e1b8a02ec76c498d90
DepartmentDepartment of TransportationStateWYPostedMar 03, 2026, 12:00 AM UTCDueJun 04, 2024, 06:00 AM UTCExpired

Federal opportunity from Wyoming Department of Transportation. Place of performance: WY. Response deadline: Jun 04, 2024.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$67,616,604,020
Sector total $67,616,604,020 • Share 100.0%
Live
Median
$307,336
P10–P90
$30,236$4,976,638
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($67,616,604,020)
Deal sizing
$307,336 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Wyoming
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 02, 2026
Wyoming • Albany, Big Horn, Campbell +20
Match signal: state match
Published Jan 02, 2026
Wyoming • Albany, Big Horn, Campbell +18
Match signal: state match
Published Jan 02, 2026
Wyoming • Albany, Big Horn, Campbell +18
Match signal: state match
Published Jan 02, 2026
Wyoming • Natrona
Match signal: state match

Point of Contact

Not available

Agency & Office

Department
Wyoming Department of Transportation
Agency
Not available
Subagency
Not available
Office
Contractor Resources
Contracting Office Address
Not available

Description

iCX Construction Management System Home Administration Aeronautics Business with WYDOT Construction Projects Driver License and Records Economic Stimulus Projects (ARRA - TIGER) Engineering and Technical Programs Fuel Tax Highway Safety Human Resources Manuals and Publications News and Information Permits Planning/Projects/Research Titles, Plates and Registration Travel Trucking / Commercial Vehicles Vehicle Business Regulation Wyoming Highway Patrol Search Sitemap Navigate Site Search: iCX Construction Management System Home Business with WYDOT Contractors iCX Construction Management System iCX Construction Management System is used for documentation and tracking of highway and bridge contracts. There are no bid lists available through this program. Browser Maintenance Browsers, browsers, browsers We're having as much fun with browser issues as you are. Like everything else, a little maintenance can go a long way. Clearing your browsers cache can help. See video on clearing the cache in Chrome, Edge, and Firefox. iCX CMS Basics iCX CMS User How to Documentation New Contracor - Create iCX Accounts User Account Options (6/24) User Accounts - Add, Modify, Inactivate (6/24) Construction Summary (6/24) Pay Estimates (6/24) Web Conferencing Training Episodes WYDOT iCX CMS Update for June 4, 2024 July 28, 2020 Certification, Subcontracting, Payroll and Misc Training Part 1 July 28, 2020 Certification, Subcontracting, Payroll and Misc Training Part 2 FHWA 1391 Annual EEO Report iCX FHWA 1391 How-To Video Shop Drawings and Certifications Videos: Introduction to Shop Drawings (rev 1-2023) Adding a Shop Drawing (rev 2-2023) Submitting Revisions (NEW 1-2023) Assigning Specific People to Shop Drawings (NEW 1-2023) Subcontractor Adding Shop Drawings (NEW 1-2023) Sorting and Filters (NEW 1-2023) Submitting Directly to the Resident Engineer (NEW 1-2023) Docs: Shop Drawings Lessons Learned Shop Drawing Cheat Sheet Certifications vs. Shop Drawings Certifications: Cert Cheat Sheet Cert Cliff Notes Payroll iCX CMS Payroll Instructions (6-2025) (pdf) How to enter new payrolls, supplemental payrolls and view reports into iCX video (9-2023) Subcontracts Subcontracting (rev 8/22) Adding Subcontractor (rev 8/22) Adding Items to subcontract (rev 8/22) Uploading Documents (rev 8/22) Request Approval (rev 8/22) Tier Subcontracts - Create New (6/24) Tier Subcontracts - Create Payment (6/24) Create Subcontractor Payment (11/23) Accept E-139 Payment (11/23) prompt payment verification Closing Subcontracts (6/24) Field Guide Leased Trucks REMINDER: Until Subcontracts are approved by WYDOT, Subcontractors will not have acccess to the project in CMS. Prequalification and Bid Envelope Requests for Highway and Bridge Construction Contractor Prequalification Instructions Rev 12-23 (617.16 KB) Bid Proposals Instructions Rev 12-23 (727.67 KB) Privacy Contact Disclaimer Citizen Business Government Visitor

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.