Skip to content
Alabama Building Renovation Finance Authority (ABRFA)

A Parking Deck for Alabama Building Renovation Finance Authority (ABRFA) (20260112)

Solicitation: Not available
Notice ID: bdc85b78470eef51bf2bf7cf8b75cc84
DepartmentAlabama Building Renovation Finance Authority (ABRFA)StateALPostedMar 05, 2026, 12:00 AM UTCDueApr 02, 2026, 03:00 PM UTCCloses in 28 days

Federal opportunity from Alabama Building Renovation Finance Authority (ABRFA). Place of performance: AL. Response deadline: Apr 02, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,326,643,366
Sector total $1,326,643,366 • Share 100.0%
Live
Median
$310,755
P10–P90
$31,174$2,491,958
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,326,643,366)
Deal sizing
$310,755 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for AL
Live POP
Place of performance
Montgomery, AL
State: AL
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 02, 2026
Alabama • Fayette, Winston
CARPENTER (Form Work Only)
Base: $15.25 • Fringe: $0.00
CEMENT MASON/CONCRETE FINISHER
Base: $15.50 • Fringe: $0.00
ELECTRICIAN
Base: $20.41 • Fringe: $7.49
Match signal: state match
Published Jan 02, 2026
Alabama • Morgan
BRICKLAYER
Base: $15.00 • Fringe: $0.00
CARPENTER, Includes Form Work
Base: $11.77 • Fringe: $0.00
CEMENT MASON/CONCRETE FINISHER
Base: $10.00 • Fringe: $0.00
Match signal: state match
Published Jan 02, 2026
Alabama • De Kalb
CEMENT MASON/CONCRETE FINISHER
Base: $16.88 • Fringe: $0.00
ELECTRICIAN
Base: $20.41 • Fringe: $7.49
FORM WORKER
Base: $15.19 • Fringe: $0.00
Match signal: state match
Published Jan 02, 2026
Alabama • Marion
CARPENTER (Form Work Only)
Base: $15.25 • Fringe: $0.00
CEMENT MASON/CONCRETE FINISHER
Base: $15.50 • Fringe: $0.00
ELECTRICIAN
Base: $20.41 • Fringe: $7.49
Match signal: state match

Point of Contact

Name
Not available
Email
info@ccrarchitecture.com
Phone
334-263-0529
Name
Not available
Email
info@ccrarchitecture.com
Phone
334-263-0529

Agency & Office

Department
Alabama Building Renovation Finance Authority (ABRFA)
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Description

A Parking Deck for Alabama Building Renovation Finance Authority (ABRFA)

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.