Avenue A Improvements Phase I
Federal opportunity from City of Temple. Place of performance: TX. Response deadline: Apr 02, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 43 more rate previews.↓
Point of Contact
Agency & Office
Description
Improvements on Ave A from S. 6th Street to the alley east of S. 2nd Street and improvements on 4th Street from Central Avenue to Ave A. Construction work includes water utilities, drainage infrastructure, enhanced pedestrian, bike, and vehicular mobility, landscaping, and signage. The engineer’s estimate of probable cost associated with this project is $1,751,425. The selected Contractor shall complete the work within 182 consecutive calendar days from Notice to Proceed.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.