Skip to content
Chaplin

Parking Lot Improvements, Intersection Realignment, and Sidewalk Construction

Solicitation: Not available
Notice ID: b8f7e7d779e2c38540ccaf84f17ad1a6
Set-AsideSBDepartmentChaplinAgencyState of CT - DAS ProcurementStateCTPostedMar 16, 2026, 12:00 AM UTCDueMar 02, 2026, 03:48 PM UTCExpired

Federal opportunity from State of CT - DAS Procurement • Chaplin, Town of. Place of performance: CT. Response deadline: Mar 02, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$875,929,545
Sector total $875,929,545 • Share 100.0%
Live
Median
$200,406
P10–P90
$26,629$2,284,413
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($875,929,545)
Deal sizing
$200,406 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for CT
Live POP
Place of performance
Hartford, CT
State: CT
Contracting office
450 Columbus Boulevard, Suite 1202 • Hartford, CT • 06103 United States

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
CT20260014 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Connecticut • Hartford
Rate
CEMENT MASON/CONCRETE FINISHER
Base $46.09Fringe $36.29
Rate
CARPENTER CARPENTERS, PILEDRIVERS
Base $42.03Fringe $29.19
+83 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 83 more rate previews.
Davis-BaconBest fitstate match
CT20260014 (Rev 1)
Open WD
Published Jan 23, 2026Connecticut • Hartford
Rate
CEMENT MASON/CONCRETE FINISHER
Base $46.09Fringe $36.29
Rate
CARPENTER CARPENTERS, PILEDRIVERS
Base $42.03Fringe $29.19
Rate
DIVER TENDER
Base $42.03Fringe $29.19
+82 more occupation rates in this WD
Davis-Baconstate match
CT20260001 (Rev 1)
Open WD
Published Jan 23, 2026Connecticut • Fairfield, Litchfield, Middlesex +3
Rate
Carpenters: CARPENTERS, PILEDRIVERS
Base $42.03Fringe $29.19
Rate
DIVER TENDERS
Base $42.03Fringe $29.19
Rate
DIVERS
Base $50.49Fringe $29.19
+59 more occupation rates in this WD
Davis-Baconstate match
CT20260022 (Rev 1)
Open WD
Published Jan 23, 2026Connecticut • Middlesex
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $48.81Fringe $33.65
Rate
BRICKLAYER
Base $45.56Fringe $36.94
Rate
BRICK POINTER/CAULKER/CLEANER
Base $45.56Fringe $36.94
+27 more occupation rates in this WD
Davis-Baconstate match
CT20260009 (Rev 1)
Open WD
Published Jan 23, 2026Connecticut • Middlesex
Rate
ELEVATOR MECHANIC
Base $66.72Fringe $38.43
Rate
POWER EQUIPMENT OPERATOR: Backhoe/Excavator 2 cubic yards and over
Base $51.92Fringe $29.80
Rate
Backhoe/Excavator under 2 cubic yards; Rubber Tire Backhoe/Excavator
Base $52.92Fringe $29.80
+18 more occupation rates in this WD

Point of Contact

Name
Questions regarding this solicitation should be
Email
assistant@chaplinct.org
Phone
Not available

Agency & Office

Department
Chaplin, Town of
Agency
State of CT - DAS Procurement
Subagency
State of CT - DAS Procurement
Office
CTsource / DAS Procurement
Contracting Office Address
450 Columbus Boulevard, Suite 1202
Hartford, CT
06103 United States

Description

Work under this contract includes construction of a new and enlarged bituminous concrete paved parking lot, Portland cement concrete sidewalks and landscaping at the Chaplin Senior Center and Library; realignment of the intersection of Chaplin Street with Phoenixville Road (CT Route 198); and new Portland cement concrete sidewalks along portions of Chaplin Street, Phoenixville Road and into Town Hall property to meet an existing sidewalk. Incidental items of work such as a painted crosswalk, pavement markings, signage, park benches, and lighting are also included. This contract is subject to state contract compliance requirements, including spending allocation goals (25% SBE and 6.25% M/W/DisBE) and non-discrimination requirements enforced by the CHRO.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.