Flood Protection Project - Water Pollution Control Facility
Federal opportunity from State of CT - DAS Procurement • Stratford, Town of. Place of performance: CT. Response deadline: Feb 04, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
The work will entail removal of existing stone riprap, excavation to approximately 3-4' depth, drilling micropiles, forming and pouring concrete pile caps and concrete walls, placement of fill for earthen embankment, installation gabion wall, reinstallation of stone riprap, and restoration of site. The total length of flood protection is 3,100 linear feet. A non-mandatory pre-bid conference on Tuesday, 17th February, 2026 at 1:30PM will begin at the Water Pollution Control Facility, 105 Beacon Point Road, Stratford, CT 06615. ***DO NOT SUBMIT BIDS ELECTRONICALLY***
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.