Skip to content
City of Revere

Inflow Removal Program - Contract 12

Solicitation: MUN-2026-1006
Notice ID: b714d736a0c48b023e7ddd1fd955140d
DepartmentCity of RevereStateMAPostedFeb 24, 2026, 12:00 AM UTCDueMar 26, 2026, 12:00 AM UTCCloses in 13 days

Federal opportunity from City of Revere. Place of performance: MA. Response deadline: Mar 26, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$394,928,985
Sector total $394,928,985 • Share 100.0%
Live
Median
$133,580
P10–P90
$32,637$752,022
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($394,928,985)
Deal sizing
$133,580 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
MA, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MA20260008 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Massachusetts • Barnstable, Bristol, Dukes +6
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
Bricklayer/Cement Mason
Base $60.35Fringe $34.40
+98 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 98 more rate previews.
Davis-BaconBest fitstate match
MA20260008 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Barnstable, Bristol, Dukes +6
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
Bricklayer/Cement Mason
Base $60.35Fringe $34.40
Rate
BRICKLAYER
Base $58.21Fringe $33.71
+97 more occupation rates in this WD
Davis-Baconstate match
MA20260016 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Berkshire
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
Rate
Group 2
Base $57.18Fringe $33.70
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $42.88Fringe $31.04
+22 more occupation rates in this WD
Davis-Baconstate match
MA20260018 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Essex
Rate
CARPENTER (Includes Form Work)
Base $50.10Fringe $31.45
Rate
ELECTRICIAN
Base $66.17Fringe $37.08
Rate
POWER EQUIPMENT OPERATOR Group 1
Base $57.83Fringe $33.70
+21 more occupation rates in this WD
Davis-Baconstate match
MA20260007 (Rev 0)
Open WD
Published Jan 02, 2026Massachusetts • Franklin
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
Power equipment operators: (1) Backhoe/Excavator/Trackhoe
Base $42.88Fringe $31.04
Rate
A (1) Loader
Base $42.88Fringe $31.04
+8 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Revere
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

CITY OF REVERE, MASSACHUSETTS INFLOW REMOVAL PROGRAM CWSRF 19086 CONTRACT 12 CITY BID NO. MUN-2026-1006 INVITATION TO BID Separate sealed bids for construction of Inflow Removal Program, Contract 12 in the City of Revere, City Bid No. MUN-2026-1006 will be received by the City of Revere Purchasing Department Agent, Michael Piccardi, at his office, Revere City Hall, 281 Broadway, Revere, MA, prior to 12:00 PM, March 26, 2026, and at that time and place bids will be publicly opened and read aloud. Time stamp in the Purchasing Office shall govern the time. The work of this Contract includes but is not necessarily limited to removing and/or redirecting illegal inflow sources, such as roof drains and sump pumps. Location of ...

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.