Spring 2023 Street Painting BID
Federal opportunity from Town of Milton. Place of performance: VT. Response deadline: Aug 31, 2023.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Incumbent & Expiration Tracking
Competitive Heat Score
Lower direct competition signal relative to other notices.
- Deadline status: Notice is already expired.
- Competition pool: Open competition (no set-aside detected).
Point of Contact
Agency & Office
Description
Bid Postings • Spring 2023 Street Painting BID Skip to Main Content Create a Website Account - Manage notification subscriptions, save form progress and more. Website Sign In Calendar Staff Directory 802-893-6655 Search Government Departments Explore How Do I... Home Bid Postings Print Sign up to receive a text message or email when new bids are added! Print Bid Title: Spring 2023 Street Painting BID Category: Public Works Status: Closed Bid Recipient: Eric Gallas: Highway Superintendent Description: TOWN OF MILTON, VERMONT 05468 Department of Public Works Administration, Engineering, Highway Operations, Water & Wastewater Telephone: 802-893-6655 • www.miltonvt.gov Highway Div. Spring 2023 Street Painting BID Haydenberry Dr. at US-7 50LF+- of white fog line _______________________ 50LF+- of white lane divide _______________________ 50LF+- of double yellow centerline _______________________ Left Turn Arrow _______________________ Right turn Arrow _______________________ Cross Walk 75LF +- _______________________ Haydenberry at McDonalds Side Street 18LF+- Stop Bar _______________________ Crosswalk 69LF+- ________________________ Mid-Block Crossings Two locations, Greenbrook Circle and Haydenberry Commons on Haydenberry Dr. Crosswalk 28LF+- ________________________ Crosswalk 28LF+- ________________________ Haydenberry/Ellison at Strawberry 14LF+- Stop Bar QT (3) ________________________ Cross walk 66LF +- ________________________ Ellison at Stacy Crosswalk 28LF+- ________________________ 14LF+- Stop Bar ________________________ Ellison at Edward 14LF+- Stop Bar QT (3) _______________________ Crosswalk 36LF+- _______________________ Ellison at Lamoille Terr . 14LF+- Stop Bar QT (3) _______________________ Crosswalk 36LF+- _______________________ Lamoille at Riverside Dr. 14LF+- Stop Bar ______________________ Lamoille at Brandy Ln. Crosswalk 36LF+- ______________________ 14LF+- Stop Bar ______________________ Lamoille at Arrowhead Ave. 14LF+- Stop Bar QT (2) _____________________ Lamoille at US-7 Crosswalk 28LF+- ______________________ 14LF+- Stop Bar ______________________ Mears at Sanderson 14LF+- Stop Bar ______________________ Mears at Everest 14LF+-Stop Bar QT (3) ______________________ Andrea Ln. At US-7 14LF+- Stop Bar QT (2) _____________________ Whisper at Railroad St. 14LF+- Stop Bar ____________________ Winter at McMullen 14LF+- Stop Bar ____________________ Railroad at Main Crosswalk 28LF+- ____________________ 12LF+- Stop Bar ____________________ Railroad at Cherry 14LF+- Stop Bar QT (3), 1 each of track and 1 at Railroad St ___________________ Railroad Crossing on Railroad (2) 14LF+- Stop Bar at Gates ____________________ Railroad at McMullen at Kingsbury Crossing Crosswalk 28LF+- ____________________ QT (2) 12LF+- Stop Bar ____________________ Villemaire Crosswalk 48LF+- ____________________ Crosswalk 28LF+- ____________________ 17LF+- Stop Bar ____________________ Hillary at Railroad (North End) Crosswalk 24LF+- ___________________ 10LF+- Stop Bar ___________________ Hillary at Railroad (South End) Crosswalk 24LF+- ___________________ 10LF+- Stop Bar ___________________ Whisper at Railroad Crosswalk 24LF+- ___________________ 10LF+- Stop Bar ___________________ Railroad at Middle Road (5) Crosswalk 28LF+- ___________________ 12LF+- Stop Bar ___________________ Main St at US 7 & River St Crosswalk 60LF+- ___________________ 20LF+- Stop Bar ___________________ Rugg Ave at Main St (Main): Crosswalk 31LF+- ___________________ (Rugg): Crosswalk 21LF+- ___________________ School Crosswalk Crosswalk 31LF+- ___________________ 12LF+- Stop Bar ___________________ Maplewood at Main St 25 Stop Bar 11LF+- ___________________ Main mid-block at W 30’ ___________________ Main St at Kienle Rd (Main): Crosswalk 30LF+- ___________________ (Kienle): 14LF+- Stop Bar ___________________ Sawmill at Main St Crosswalk 24LF+- ___________________ 10LF+- Stop Bar ___________________ Sunset Ave 10LF+- Stop Bar ___________________ Main St (East) at Westford (North) (Main): Crosswalk 30LF+- ___________________ Main (East): 35LF+- of Crosswalk, 15LF+- Stop Bar ___________ Westford (North): 15LF+- Stop Bar ___________________ Erling Crosswalk 30LF+- ___________________ 12LF+- Stop Bar ___________________ Westford at Hunting Ridge Crosswalk 33LF+- ___________________ 12LF+- Stop Bar ___________________ Horseshoe Crosswalk 42LF+- ___________________ 12LF+- Stop Bar ___________________ Hunting Ridge at North Rd Crosswalk 28LF+- ___________________ 12LF+- Stop Bar ___________________ Quarry Ln at North Crosswalk 40LF+- ___________________ 12LF+- Stop Bar ___________________ Total Project Cost for above listed work: ___________________________________ All work must meet MUTCD standards, the contractor will be responsible for any and all traffic controls, flagging and signage related to said work. AEXCEL or Franklin in two coats with glass beads shall be used or an approved equivalent. All work shall be completed by August 31, 2023. BIDS due sealed in person to the Town of Milton Municipal Building, Public Works Department, by 11am Monday, July 31, 2023. Envelopes containing completed bids must be sealed, marked, and addressed as follows, and must also show the Bidder's complete name and address. Town of Milton 43 Bombardier Road Milton, Vermont 05468 Any Questions shall be directed to Eric Gallas Highway Superintendent Eric Gallas Highway Superintendent 802-559-2266 or 802-891-8008 Lisa Schaeffler Director of Public Works 802-891-8045 or 802-752-9803 Publication Date/Time: 7/17/2023 10:30 AM Closing Date/Time: 7/31/2023 11:00 AM Pre-bid Meeting: N/A Contact Person: Any Questions shall be directed to Eric Gallas Highway Superintendent Eric Gallas Highway Superintendent 802-559-2266 or 802-891-8008 egallas@miltonvt.gov Lisa Schaeffler Director of Public Works 802-891-8045 or 802-752-9803 lschaeffler@miltonvt.gov Business Hours: 8AM-5PM Special Requirements: All work must meet MUTCD standards, the contractor will be responsible for any and all traffic controls, flagging and signage related to said work. AEXCEL or Franklin in two coats with glass beads shall be used or an approved equivalent. All work shall be completed by August 31, 2023. BIDS due sealed in person to the Town of Milton Municipal Building, Public Works Department, by 11am Monday, July 31, 2023. Envelopes containing completed bids must be sealed, marked, and addressed as follows, and must also show the Bidder's complete name and address. Town of Milton 43 Bombardier Road Milton, Vermont 05468 Any Questions shall be directed to Eric Gallas Highway Superintendent Related Documents: Spring Painting BID 2023 Return To Main Bid Postings Page Live Edit Report a Concern Agendas & Minutes Online Payments Alerts & Notifications Recreation & Parks Form Center Contact Information Contact Us Town of Milton, Vermont 43 Bombardier Road Milton, VT 05468 Phone: 802-893-6655 Contact Us Quick Links Bids & Requests for Proposals Employment Opportunities Staff Directory All Applications Milton Town School District /QuickLinks.aspx Using this Site Home Site Map Contact Us Accessibility Copyright Notices /QuickLinks.aspx Government Websites by CivicPlus® Loading Loading Do Not Show Again Close Arrow Left Arrow Right [{"WidgetSkinID":74,"ComponentType":3,"FontFamily":"","FontVariant":"","FontColor":"","FontSize":0.00,"FontStyle":0,"TextAlignment":0,"ShadowColor":"","ShadowBlurRadius":0,"ShadowSpreadRadius":0,"ShadowOffsetX":0,"ShadowOffsetY":0,"ShadowInset":false,"ShadowColor2":"","ShadowBlurRadius2":0,"ShadowSpreadRadius2":0,"ShadowOffsetX2":0,"ShadowOffsetY2":0,"ShadowInset2":false,"ShadowColor3":"","ShadowBlurRadius3":0,"ShadowSpreadRadius3":0,"ShadowOffsetX3":0,"ShadowOffsetY3":0,"ShadowInset3":false,"ShadowColor4":"","ShadowBlurRadius4":0,"ShadowSpreadRadius4":0,"ShadowOffsetX4":0,"ShadowOffsetY4":0,"ShadowInset4":false,"ShadowColor5":"","ShadowBlurRadius5":0,"ShadowSpreadRadius5":0,"ShadowOffsetX5":0,"ShadowOffsetY5":0,"ShadowInset5":false,"Capitalization":0,"HeaderMiscellaneousStyles1":"","HeaderMiscellaneousStyles2":"","HeaderMiscellaneousStyles3":"","BulletStyle":0,"BulletWidth":2.00,"BulletColor":"","LinkNormalColor":"","LinkNormalUnderlined":false,"LinkNormalMiscellaneousStyles":"","LinkVisitedColor":"","LinkVisitedMiscellaneousStyles":"","LinkHoverColor":"","LinkHoverUnderlined":false,"LinkHoverMiscellaneousStyles":"","LinkSelectedUnderlined":false,"ForceReadOnLinkToNewLine":false,"DisplayColumnSeparator":false,"ColumnSeparatorWidth":0.0000,"HoverBackgroundColor":"","HoverBackgroundGradientStartingColor":"","HoverBackgroundGradientEndingColor":"","HoverBackgroundGradientDirection":0,"HoverBackgroundGradientDegrees":0.0000000,"HoverBackgroundImageFileName":"","HoverBackgroundImagePositionXUseKeyword":true,"HoverBackgroundImagePositionXKeyword":0,"HoverBackgroundImagePositionX":{"Value":0.0000,"Unit":0},"HoverBackgroundImagePositionYUseKeyword":true,"HoverBackgroundImagePositionYKeyword":0,"HoverBackgroundImagePositionY":{"Value":0.0000,"Unit":0},"HoverBackgroundImageRepeat":0,"HoverBorderStyle":0,"HoverBorderWidth":0,"HoverBorderColor":"","HoverBorderSides":15,"HoverBorderRadiusTopLeft":{"Value":null,"Unit":1},"HoverBorderRadiusTopRight":{"Value":null,"Unit":1},"HoverBorderRadiusBottomRight":{"Value":null,"Unit":1},"HoverBorderRadiusBottomLeft":{"Value":null,"Unit":1},"SelectedBackgroundColor":"","SelectedBackgroundGradientStartingColor":"","SelectedBackgroundGradientEndingColor":"","SelectedBackgroundGradientDirection":0,"SelectedBackgroundGradientDegrees":0.0000000,"SelectedBackgroundImageFileName":"","SelectedBackgroundImagePositionXUseKeyword":true,"SelectedBackgroundImagePositionXKeyword":0,"SelectedBackgroundImagePositionX":{"Value":0.0000,"Unit":0},"SelectedBackgroundImagePositionYUseKeyword":true,"SelectedBackgroundImagePositionYKeyword":0,"SelectedBackgroundImagePositionY":{"Value":0.0000,"Unit":0},"SelectedBackgroundImageRepeat":0,"SelectedBorderStyle":0,"SelectedBorderWid
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.