W074--Market Research/Sources Sought Only Montgomery Mail Meter Machine
Sources Sought from VETERANS AFFAIRS, DEPARTMENT OF • VETERANS AFFAIRS, DEPARTMENT OF. Place of performance: AL. Industry: NAICS 532420 • PSC W074.
Market snapshot
Awarded-market signal for NAICS 532420 (last 12 months), benchmarked to sector 53.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 532420
Description
MARKET RESEARCH ONLY SOURCES SOUGHT MONTGOMERY VA REGIONAL OFFICE STATEMENT OF WORK Mail Meter Machines VA Regional Office, Montgomery, Alabama INTRODUCTION The U.S. Department of Veterans Affairs, Veterans Benefits Regional Office Montgomery, Alabama is seeking a certified vendor to provide the lease for installation, and maintenance upkeep of one (1) new Mail Meter Machine. 345 Perryhill Road Building 42 Montgomery, Al 36109 Duration. The term of this requirement will consist of a one (1)-year base period with four (4)-one (1) year option periods. The machine currently possessed is a: Pitney Bowes Sendpro 3000 with IBI technology. Scope of Work Contractor will: Conduct field site survey at location to verify measurements, exact locations, connectivity, and site conditions for the installation of one leased mail meter machine to comply with the FIPS 140-2 Security Level 3+ standards. Provide and install one leased mail meter machine according to the specifications in the minimum specifications section of this SOW. Certify all connections to ensure proper operation. Provide training to personnel in each office Provide for routine maintenance and repairs, as well as emergency repairs within four hours of initiation by the respective offices. GOVERNMENT FURNISHED ITEMS AND SERVICES Parking. The government shall provide a no-cost parking space and access to the Regional Office as necessary. CONTRACTOR FURNISHED ITEMS AND SERVICES GENERAL. The Contractor shall: Provide all supervision, labor, administrative support, materials, tools, parts, supplies, equipment, software, hardware, freight, lodging, transportation costs (rental car, air fare, etc.), per diem, and transportation to and from work site, necessary to fulfill all the requirements of this Statement of Work (SOW) effectively and efficiently. Provide a fully qualified on-site technician who shall be responsible for the performance of work. The name of the person and all alternates shall be designated in writing to the Contracting Officer Representative (COR). The technician shall have full authority to act for the contractor. The technician shall be on-site during work hours (8am to 4pm) and for contingencies requiring work beyond normal work hours. The Contracting Officer (CO) shall have the right to determine whether the proposed representative has sufficient technical and lingual capabilities, and the contractor shall immediately replace any individual not acceptable to the Government. Have a thorough knowledge of the installation and functionality of Mail Meter machines. Provide and utilize on the job site any diagnostic equipment that will enable the Contractor to diagnose/troubleshoot/repair/replace all components to the Meter units. Be responsible for the acts and omissions of their employees and all subcontractors, their agents and employees and all other persons performing any work under contract with the Contractor. Not deposit contractor debris in government contracted waste containers. Perform work in an occupied space during normal working hours from 8 AM to 4 PM. Respond within 4 hours of being called for repair issues. Provide transportation costs (rental car, air fare, etc.), per diem, and transportation to and from work site, necessary to fulfill all the requirements of this Statement of Work (SOW) effectively and efficiently. SECURITY. The Contractor is required to enter and exit each building through the front entrance. Entering or exiting the building through any other door will require VARO approval and an escort. Upon entering the building, the contractor and/or contractor employees will be required to show proof of identity (must have a valid photo ID) as well as pass through a security screening. SAFETY. The following safety criteria shall be met at the time of the acceptance inspection: Equipment. The Contractor shall provide all safety equipment/devices, personal protective equipment and clothing as required for its employees. Compliance with Laws. Contractor represents and warrants that the performance of this contract and the furnishing of goods or services required shall be in accordance with the applicable standards, provisions and stipulations of all pertinent Federal, State or Authority laws, rules, regulations, resolutions, and ordinances including but not limited to the Fair Labor Standards Act, the Equal Employment Opportunity rules and regulations, the Transportation Safety Act, the National Environmental Policy Act, and the Occupational Safety and Health Acts. DESCRIPTION OF SERVICES. The following services shall be provided by the Contractor: Phase I - Pre-installation. The Contractor will provide all equipment, parts, labor, and expertise necessary to complete the required pre-installation inspection. The Contractor will: Perform a physical pre-installation inspection to evaluate site conditions and verify field measurements prior to submitting a bid towards this statement of work. Ensure all components necessary to install the new Meter Machine are on hand prior beginning installation. The Contractor will ensure all work permits and licenses, if required, are on hand prior beginning any work. Phase II Installation. The Contractor will provide all parts, labor, and expertise necessary to complete the required installations. Phase III Post Installation. During the post installation phase, the Contractor will: Ensure all installation material and debris is removed from the property. All waste and debris will be removed from the VA property and disposed of in accordance with local, state, and federal regulations. No waste or debris will be deposited in, on, or around any VA trash containers. Ensure current mail meter is properly decommissioned and returned to Pitney Bowes with receipt acknowledgement. Provide training to VA personnel on operation of new Meter Machines. Maintenance. The contractor shall perform scheduled maintenance on the Mail Meter Machine located at the property as per manufacturers recommendations. Contractor will provide all parts, labor, and expertise necessary to complete required maintenance tasks at no additional cost to the government. Emergency requests will be responded to within 4 hours. Scheduled maintenance The contractor shall provide a once a year scheduled maintenance plan when submitting their quote. Inoperable Meter components will be repaired or replaced within 24 hours. Parts include those items that must be replaced due to fair wear and tear. The cost for parts and labor for maintenance or damage resulting from operator negligence may be submitted to the Contracting Officer for consideration of a modification to the contract. Meter spare parts inventory. The contractor will maintain a spare parts inventory sufficient for specified maintenance and repair requirements to keep the Meters continuously operating. Under normal conditions a Meter Machine should not be unserviceable for more than 24 hours. MINIMUM MAIL METER MACHINE SPECIFICATIONS: The Mail Meter Machines for the Regional Office shall be equivalent to existing mail machine with IMI meter technology. Key Components A touch screen and keypad for input Minimum 50 lb. weighing platform Label dispenser Automatic mail feeder Automatic envelope sealing system Conveyor stacker Ethernet connectivity Pull updates over-the-air for postal rate updates and funds Batch processing speed of at least 110 letters per minute Ability to process .75-inch-thick envelopes High-capacity ink tank
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.