Skip to content
HOPE for Children Trust Acct

HOPE06-25 - Marketing and Outreach Services

Solicitation: Not available
Notice ID: acb31724732aad0a8d9d03dbc9d13e24
DepartmentHOPE for Children Trust AcctStateCAPostedMar 10, 2026, 12:00 AM UTCDueApr 06, 2026, 11:00 PM UTCCloses in 25 days

Federal opportunity from HOPE for Children Trust Acct. Place of performance: CA. Response deadline: Apr 06, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$386,765,285
Sector total $386,765,285 • Share 100.0%
Live
Median
$129,570
P10–P90
$32,637$689,094
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($386,765,285)
Deal sizing
$129,570 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
CA20260026 (Rev 2)
Match signal: state matchOpen WD
Published Jan 23, 2026California • San Bernardino
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
+130 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 130 more rate previews.
Davis-BaconBest fitstate match
CA20260026 (Rev 2)
Open WD
Published Jan 23, 2026California • San Bernardino
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+129 more occupation rates in this WD
Davis-Baconstate match
CA20260012 (Rev 2)
Open WD
Published Jan 23, 2026California • San Luis Obispo
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+128 more occupation rates in this WD
Davis-Baconstate match
CA20260024 (Rev 2)
Open WD
Published Jan 23, 2026California • Orange
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+127 more occupation rates in this WD
Davis-Baconstate match
CA20260025 (Rev 2)
Open WD
Published Jan 23, 2026California • Riverside
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+123 more occupation rates in this WD

Point of Contact

Name
Ashley Peters
Email
ashley.peters@treasurer.ca.gov
Phone
Not available
Name
Ashley Peters
Email
ashley.peters@treasurer.ca.gov
Phone
Not available

Agency & Office

Department
HOPE for Children Trust Acct
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Description

You are invited to review and respond to Request for Proposals (RFP) No. HOPE06-25 for marketing and outreach services. The California Hope, Opportunity, Perseverance, and Empowerment (HOPE) for Children Trust Account Program is a new program that aims to close the racial wealth gap and confront the issue of intergenerational poverty. It creates a new financial investment program specifically catered to vulnerable children throughout the state of California. HOPE provides trust accounts for eligible foster youth and other vulnerable youth populations to support long-term financial stability, postsecondary success, and economic mobility. To achieve this, HOPE requires a qualified firm to increase public awareness, promote participant engagement, and support enrollment and sustained participation of the Program through coordinated, accessible, and compliant marketing activities. Proposals for these services must comply with the instructions included in the attached RFP.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.