Skip to content
University of Montana

University of Montana - Eck Hall Phase 2 AV

Solicitation: UOM-IFB-2023-3250
Notice ID: abb1d7ef3bba4d1ecde336a3f6b4b754
DepartmentUniversity of MontanaStateMTPostedAug 16, 2023, 12:00 AM UTCDueAug 29, 2023, 12:00 AM UTCExpired

Federal opportunity from University of Montana. Place of performance: MT. Response deadline: Aug 29, 2023.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,912,205,491
Sector total $1,912,205,491 • Share 100.0%
Live
Median
$168,000
P10–P90
$28,970$2,500,000
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,912,205,491)
Deal sizing
$168,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
MT, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MT20260080 (Rev 1)
Match signal: state matchOpen WD
Published Jan 30, 2026Montana • Beaverhead, Big Horn, Blaine +52
Rate
CARPENTER Carpenter
Base $36.49Fringe $14.33
Rate
Millwright
Base $40.45Fringe $21.25
+25 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 25 more rate previews.
Davis-BaconBest fitstate match
MT20260080 (Rev 1)
Open WD
Published Jan 30, 2026Montana • Beaverhead, Big Horn, Blaine +52
Rate
CARPENTER Carpenter
Base $36.49Fringe $14.33
Rate
Millwright
Base $40.45Fringe $21.25
Rate
CEMENT MASON/CONCRETE FINISHER
Base $33.41Fringe $16.51
+24 more occupation rates in this WD
Davis-Baconstate match
MT20260034 (Rev 1)
Open WD
Published Jan 30, 2026Montana • Glacier
Rate
Heat and Frost Insulator
Base $43.81Fringe $21.87
Rate
BOILERMAKER
Base $38.75Fringe $32.31
Rate
BRICKLAYER
Base $33.11Fringe $17.18
+23 more occupation rates in this WD
Davis-Baconstate match
MT20260063 (Rev 1)
Open WD
Published Jan 30, 2026Montana • Missoula
Rate
Heat and Frost Insulator
Base $43.81Fringe $21.87
Rate
BOILERMAKER
Base $38.75Fringe $32.31
Rate
BRICKLAYER
Base $33.11Fringe $16.69
+17 more occupation rates in this WD
Davis-Baconstate match
MT20260078 (Rev 1)
Open WD
Published Jan 30, 2026Montana • Lake, Lincoln, Mineral +2
Rate
ELECTRICIAN
Base $41.21Fringe $17.98
Rate
POWER EQUIPMENT OPERATOR: (Zone 1) (1) A-frame truck Crane, oiler (except crane)
Base $23.47Fringe $10.40
Rate
Crane Oiler,Bulldozer, Roller (Dirt and Grade Compaction)
Base $23.94Fringe $10.40
+17 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
University of Montana
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

University of Montana Eck Hall Phase 2 AV Equipment

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.