Bid RFCSP #25-12 - District Wide Roofing Projects Phase V
Federal opportunity from Judson ISD. Place of performance: TX. Response deadline: Mar 24, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 43 more rate previews.↓
Point of Contact
Agency & Office
Description
The Project is generally described as follows: Roof replacement or recover at five (5) campuses or facilities including; the Judson ISD Administration Building, the Educational Resource Center, the Facilities Planning Department, J-TECH and Salinas Elementary School. The project includes the replacement of low slope roofs with new Modified Bitumen membrane assemblies and replacement or recover of Standing Seam Metal roofs.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.