2026 Barton Dam - Security Improvements
Federal opportunity from City of Ann Arbor. Place of performance: MI. Response deadline: Mar 19, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 55 more rate previews.↓
Point of Contact
Agency & Office
Description
The purpose of this Request for Proposal (RFP) is to select a firm to provide construction services to improve security at Barton Dam, embankments, and adjacent powerhouse. Prospective Bidders shall be required to complete a Non-Disclosure Agreement (NDA) before Bid Drawings, Detailed Specifications and Soils information are provided. The NDA form can be found in Section IV. Completed NDA form Addendum 1 and should be submitted to paul.malocha@stantec.com . Upon completion and submission to the City, Bid Drawings, Detailed Specifications and Soils information will be provided electronically to the Bidder's designated contact via an encrypted email.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.