Project Information System (PRISM) Maintenance and Enhancements
Federal opportunity from Washington State • Recreation and Conservation Office, Washington State. Place of performance: WA. Response deadline: Jun 01, 2025.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Modifications of existing modules/workbenches, Troubleshooting, updates, maintenance, and integration of GIS services, Support RCO with GIS enhancements and updates, Resolution of software problems, Development and modification of reports and system web pages, Requirement gathering, analysis, design and development of new modules, Upgrade to new third-party technologies. Server and operating system upgrades, Application maintenance and security, Database maintenance and security
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.