Skip to content
Department of Water Resources

Specification No. 24-07 (C51668) Physical Security Upgrades (South) - SJFD - Phase I, San Joaquin Field Division O&M Center, Chrisman Pumping Plant, and Edmonston Pumping Plant

Solicitation: Not available
Notice ID: a5b6141ea4d64b1711c5a8ff0d24f71a
DepartmentDepartment of Water ResourcesStateCAPostedJan 16, 2026, 12:00 AM UTCDueFeb 19, 2026, 07:00 PM UTCExpired

Federal opportunity from Department of Water Resources. Place of performance: CA. Response deadline: Feb 19, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,211,585,752
Sector total $2,211,585,752 • Share 100.0%
Live
Median
$319,551
P10–P90
$27,470$10,024,650
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,211,585,752)
Deal sizing
$319,551 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for CA
Live POP
Place of performance
Meet at 9:00 AM - DWR San Joaquin Field Division, 4201 S Sabodan St, Bakersfield, CA 93313. (35°01'14.8"N 118°58'32.6"W). 11:30 AM - A. D.Edmonston Pumping Plant, 39000 Edmonston Pumping Plant Rd, Lebec, CA 93243. (34°56'50.9"N 118°49'45.0"W).
State: CA
Contracting office
Not listed

Point of Contact

Name
Judy Li
Email
doe_specs@water.ca.gov
Phone
Not available
Name
Judy Li
Email
doe_specs@water.ca.gov
Phone
Not available

Agency & Office

Department
Department of Water Resources
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Description

This project will construct security upgrades at three sites for San Joaquin Field Division: 1) Operations and Maintenance (O&M) Center; 2) Chrisman Pumping Plant, and 3) Edmonston Pumping Plant. The work includes the following principal features: impact rated gates with and without automatic gate operator systems, card reader islands, bollards, fencing, security camera poles, security hardening of doors/windows, conduit trenching, prefabricated guard shack, precast reinforced concrete box culvert with headwalls, liner and rock slope protection. Estimated Cost: $9,000,000 - $12,500,000 A nondisclosure agreement must be signed to obtain access to contract documents. To register as a plan holder or bidder, please email doe_specs@water.ca.gov.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.