Curtis Hill Road and SR 6 Water Main Replacement
Federal opportunity from Boistfort Valley Water. Place of performance: WA. Response deadline: Apr 07, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 37 more rate previews.↓
Point of Contact
Agency & Office
Description
Sealed Proposals will be received by the undersigned at Boistfort Valley Water, 442 Curtis Hill Road, Chehalis, Washington 98532, up to 11:00 a.m.; local time on Tuesday, April 7, 2026, for furnishing the necessary labor, materials, equipment, tools, and guarantees thereof to construct the Curtis Hill Road and SR 6 Water Main Replacement. The Project includes three schedules: Schedule A includes installing approximately 8,600 linear feet of 8-inch water main along Curtis Hill Road from 442 Curtis Hill Road to SR 6. Schedule B includes installing approximately 2,545 linear feet of 8-inch water main along SR 6 from Curtis Hill Road to 1784 State Route 6. Schedule C work includes installing approximately 790 linear feet of 6-inch water main al...
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.