Golden Triangle Infrastructure Improvement Project – Contract A
Federal opportunity from Trumbull County, OH. Place of performance: OH. Response deadline: Mar 24, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
Description
Sealed bids for the Golden Triangle Infrastructure Improvement Project – Contract A for the Golden Triangle Coalition including the Board of Trumbull County Commissioners will be received at their 5th floor office in the County Administration Building, 160 High Street, N.W., Warren, Ohio, until 2 P.M. Warren, Ohio Time, on or before Tuesday, March 24, 2026 @ 2 P.M. and shall be opened and read the same day thereafter. Coalition Partners include the Board of Trumbull County Commissioners, the Trumbull Engineer’s Office, the Trumbull County Planning Commission, the City of Warren and Howland Township. Facsimile or electronic transmissions are not permitted.Show Less
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.