Skip to content
Department of Energy

Warm Waste Pond

Solicitation: INL-26-020
Notice ID: 998ced3b51f84830b4ee9aadfb6064d2
TypeSources SoughtDepartmentDepartment of EnergyStateIDPostedFeb 17, 2026, 12:00 AM UTCDueMar 18, 2026, 05:59 AM UTCCloses in 23 days

Sources Sought from ENERGY, DEPARTMENT OF • ENERGY, DEPARTMENT OF. Place of performance: ID. Response deadline: Mar 18, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$659,327,406
Sector total $659,327,406 • Share 100.0%
Live
Median
$157,798
P10–P90
$29,611$1,830,899
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($659,327,406)
Deal sizing
$157,798 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for ID
Live POP
Place of performance
Idaho Falls, Idaho • 83415 United States
State: ID
Contracting office
Idaho Falls, ID • 83415 USA

Point of Contact

Name
Chase Egbert
Email
chase.egbert@inl.gov
Phone
Not available

Agency & Office

Department
ENERGY, DEPARTMENT OF
Agency
ENERGY, DEPARTMENT OF
Subagency
BATTELLE ENERGY ALLIANCE–DOE CNTR
Office
Not available
Contracting Office Address
Idaho Falls, ID
83415 USA

Description

Expression of Interest


Warm Waste Pond
1. INTRODUCTION
Battelle Energy Alliance, LLC (BEA) Management & Operating Contractor of the U.S. Department of Energy (DOE) owned Idaho National Laboratory (INL), is seeking an Expression of Interest (EOI) from qualified vendors for the construction of a new lined warm waste pond at the Advanced Test Reactor (ATR) Complex to support ongoing ATR operations.

2. BACKGROUND
INL is a U.S. Department of Energy (DOE) national laboratory dedicated to nuclear energy, national security, and clean energy innovation. The ATR Complex requires an additional lined pond to expand the capacity and enhance resiliency. Subcontractors should expect compliance with applicable federal, state, and local requirements – including environmental, safety, and electrical standards – and INL site procedures and quality programs. The scope of work may include the following:
• Pond footprint up to ~25% larger than existing individual warm waste ponds.
• CSPE-R primary geomembrane liner installation, including subgrade preparation, anchor trenches, and seam QA/QC.
• HDPE secondary liner (double-lined system) with leak-detection layers and monitoring infrastructure.
• Extension of the existing gravel road for construction access and long-term operations.
• Extension of existing chain-link fence and security features around the new pond.
• Power service to the new pond, including electrical distribution for monitoring, pumping, and controls.
• Extension of the existing discharge line to the new pond with required tie-ins and isolation.
• Leak detection system and redundant pumping system, including controls integration and performance testing.

3. PROCESS
This EOI is the first step in identifying interested and qualified vendors. Responses may be used to inform the development of a formal solicitation list. Selected vendors may be invited to participate in a Request for Proposal (RFP) process for award consideration.
 

4. SUBMITTAL REQUIREMENTS
Interested vendors should submit an Expression of Interest that includes the following:
• Company name and point of contact
• Description of relevant capabilities and experience with earthwork and pond construction; CSPE-R and HDPE geomembrane installation; double-liner leak-detection systems; industrial pumping and controls; civil/site (roads, rending); and pipeline extensions in industrial settings.
• NAICS codes and business size classification
• Any existing DOE or federal contracting experience (if applicable)
Deadline for submission: March 17, 2026 Submit to: Chase.Egbert@inl.gov
Only selected respondents, as determined by BEA, will receive an invitation to participate in the anticipated RFP solicitation.

5. PROPRIETARY INFORMATION
Because information received in response to this EOI may be business sensitive or proprietary to the responding party, respondents must mark information in their responses accordingly.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.