Addendum#1 BDC16-25/26 Office of Resilience & Coastal Protection-SE Region - Quayside Dock Shoreline
Federal opportunity from Department of Environmental Protection. Place of performance: FL. Response deadline: Feb 19, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
<p><strong>February 3, 2026</strong></p><p> </p><p><strong>NOTICE TO APPLICANTS</strong></p><p><strong>ADDENDUM NO. ONE (1)</strong></p><p> </p><p><strong>DEP- Office of Resilience & Coastal Protection - SE Region – Quayside Dock Shoreline Stabilization </strong></p><p><strong>DEP BID NO. BDC16-25/26</strong></p><p> </p><p> </p><p> TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.</p><p> </p><h3>NOTICE</h3><p> </p><p>It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Alisha Sadler, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.</p><p> </p><p>_______________________________________</p><p>Signature of Contractor and Date</p><p> </p><p><strong>The following statements supersede & supplement the corresponding items in the specifications & drawings:</strong></p><p> </p><ol><li><strong>Question: Pursuant</strong> to the above referenced bid for the Quayside Dock Shoreline Stabilization Project, I am writing to inquire if an equivalent or superior alternate shoreline stabilization product would be considered for this project? I noticed that the Department requires the proposed project be designed and constructed in accordance with green building standards where applicable and Shoreline Erosion Control Solutions manufactures two superior alternates exist that offer better value engineering over the lifespan of the project. </li></ol><p> </p><p><strong>Answer: </strong>Please use materials specified in bid documents.</p><p> </p><p>In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.</p>
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.