UST/AST REMOVALS AND REPLACEMENTS
Federal opportunity from Airports • Transportation. Place of performance: HI. Response deadline: Feb 28, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Refer to Specifications
[1] Response to all Questions and Requests for Information (RFIs) shall be issued ONLY by formal Addendum to this Solicitation and posted to HIePRO. [2] Bidders shall submit and upload their complete proposal document(s) to HIePRO prior to the posted Offer Due Date and Time. Proposals received after said due date and time shall not be considered. Any additional support documents explicitly designated as Confidential and/or Proprietary shall be uploaded in separate file(s) to HIePRO -- do NOT include any confidential or proprietary content in the proposal file. FAILURE TO UPLOAD THE REQUIRED PROPOSAL DOCUMENT(S) TO HIePRO SHALL BE GROUNDS FOR REJECTION OF THE BID.
Postponing bid opening deadline.
236220: Construction management, commercial and institutional building; 238210: Electrical contractors; 236220: Institutional building construction; 238290: Incinerators, building equipment type, installation; 562910: Site remediation services; 238220: Plumbing and heating contractors; 238910: Mine site preparation and related construction activities, construction contractors; 236220: Commercial building construction
Refer to Specifications
[1] Response to all Questions and Requests for Information (RFIs) shall be issued ONLY by formal Addendum to this Solicitation and posted to HIePRO. [2] Bidders shall submit and upload their complete proposal document(s) to HIePRO prior to the posted Offer Due Date and Time. Proposals received after said due date and time shall not be considered. Any additional support documents explicitly designated as Confidential and/or Proprietary shall be uploaded in separate file(s) to HIePRO -- do NOT include any confidential or proprietary content in the proposal file. FAILURE TO UPLOAD THE REQUIRED PROPOSAL DOCUMENT(S) TO HIePRO SHALL BE GROUNDS FOR REJECTION OF THE BID.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.