Skip to content
Nampa School District

9 ITB Student Transportation_BBC agrees

Solicitation: Not available
Notice ID: 925d06f2376dd822b66850a94d2ad17b
DepartmentNampa School DistrictStateIDPostedApr 17, 2026, 12:00 AM UTCDueNo due date posted

Federal opportunity from Nampa School District. Place of performance: ID.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,275,750,127
Sector total $2,275,750,127 • Share 100.0%
Live
Median
$146,315
P10–P90
$27,574$1,433,570
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,275,750,127)
Deal sizing
$146,315 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Map for ID
Live POP
Place of performance
Nampa, ID
State: ID
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
ID20260107 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Idaho • Kootenai, Nez Perce
Rate
BRICKLAYER
Base $35.53Fringe $19.85
Rate
CARPENTER
Base $44.98Fringe $17.84
+14 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 14 more rate previews.
Davis-BaconBest fitstate match
ID20260107 (Rev 1)
Open WD
Published Jan 23, 2026Idaho • Kootenai, Nez Perce
Rate
BRICKLAYER
Base $35.53Fringe $19.85
Rate
CARPENTER
Base $44.98Fringe $17.84
Rate
ELECTRICIAN
Base $48.55Fringe $19.09
+13 more occupation rates in this WD
Davis-Baconstate match
ID20260106 (Rev 1)
Open WD
Published Jan 23, 2026Idaho • Canyon, Gem
Rate
BRICKLAYER
Base $35.53Fringe $19.85
Rate
POWER EQUIPMENT OPERATOR Forklift
Base $36.33Fringe $15.40
Rate
Loader
Base $36.14Fringe $16.10
+13 more occupation rates in this WD
Davis-Baconstate match
ID20260108 (Rev 1)
Open WD
Published Jan 23, 2026Idaho • Ada
Rate
LINE CONSTRUCTION (Lineman)
Base $51.02Fringe $17.93
Rate
POWER EQUIPMENT OPERATOR (Crane)
Base $36.98Fringe $20.50
Rate
POWER EQUIPMENT OPERATOR (Backhoe/Excavator/Trackhoe)
Base $36.14Fringe $16.10
+5 more occupation rates in this WD
Davis-Baconstate match
ID20260112 (Rev 1)
Open WD
Published Jan 23, 2026Idaho • Kootenai, Nez Perce
Rate
POWER EQUIPMENT OPERATOR (Crane)
Base $36.98Fringe $20.50
Rate
POWER EQUIPMENT OPERATOR (Backhoe/Excavator/Trackhoe)
Base $36.14Fringe $16.10
Rate
IRONWORKER
Base $43.40Fringe $30.27
+3 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Nampa School District
Agency
Not available
Subagency
Not available
Office
Purchasing
Contracting Office Address
Not available

Description

9 ITB Student Transportation_BBC agrees

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.