Skip to content
Lextran

Security & Access Control

Solicitation: 2026-02
Notice ID: 8e66f126f20295589184ad50740d2963
DepartmentLextranStateKYPostedFeb 27, 2026, 12:00 AM UTCDueApr 29, 2026, 12:00 AM UTCCloses in 46 days

Federal opportunity from Lextran. Place of performance: KY. Response deadline: Apr 29, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$749,153,672
Sector total $749,153,672 • Share 100.0%
Live
Median
$191,909
P10–P90
$26,352$2,547,835
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($749,153,672)
Deal sizing
$191,909 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
KY, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
KY20260082 (Rev 0)
Match signal: state match • county matchOpen WD
Published Jan 02, 2026Kentucky • Bourbon, Clark, Fayette +3
Rate
ELECTRICIAN
Base $40.96Fringe $22.44
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $41.55Fringe $19.60
+18 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 18 more rate previews.
Davis-BaconBest fitstate match • county match
KY20260082 (Rev 0)
Open WD
Published Jan 02, 2026Kentucky • Bourbon, Clark, Fayette +3
Rate
ELECTRICIAN
Base $40.96Fringe $22.44
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $41.55Fringe $19.60
Rate
GROUP 2
Base $38.69Fringe $19.60
+17 more occupation rates in this WD
Davis-Baconstate match
KY20260036 (Rev 0)
Open WD
Published Jan 02, 2026Kentucky • Whitley
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.24Fringe $18.54
Rate
BOILERMAKER
Base $43.85Fringe $28.44
Rate
CARPENTER (Includes Form Work; Excludes Acoustical Ceiling Installation, Drywall Hanging, and Metal Stud Installation)
Base $32.25Fringe $18.09
+33 more occupation rates in this WD
Davis-Baconstate match
KY20260065 (Rev 0)
Open WD
Published Jan 02, 2026Kentucky • Campbell
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $35.23Fringe $23.04
Rate
ELECTRICIAN
Base $40.96Fringe $22.44
Rate
POWER EQUIPMENT OPERATOR (Backhoe/Excavator/Trackhoe)
Base $44.14Fringe $16.41
+19 more occupation rates in this WD
Davis-Baconstate match
KY20260079 (Rev 0)
Open WD
Published Jan 02, 2026Kentucky • Warren
Rate
CARPENTER (Form Work Only)
Base $33.89Fringe $24.06
Rate
ELECTRICIAN
Base $37.10Fringe $8.60
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $41.55Fringe $19.60
+18 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Lextran
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

The Transit Authority of Lexington-Fayette Urban County Government, herein referred to as Lextran is issuing this Request for Proposals (RFP) to award a competitive contract to a firm for security and access control services.Title: Security & Access ControlReference Number: 2026-02Proposals for Furnishing the Product(s) / Service(s) Described Herein Will Be Received Until:2:00 pm eastern time on Wednesday, April 29, 2026. Proposals received after the time specified may not be considered for award. Proposals shall be submitted online via Lextran's eProcurement PortalIf you have any questions on this project, please submit your questions via the Q&A section on Lextran's eProcurement Portal. All questions, requests for clarification or comments concerning this RFP are due from proposers by end of day on Friday, March 20, 2026. Lextran’s response to questions will be provided as responses within the Q&A tab. For questions that require additional documentation or a change to the RFP document itself, Lextran will publish an addendum. Lextran intends to respond to questions as they come in, and responses will be provided no later than the question response date.Lextran may reject any submissions that are incomplete or non-responsive or submitted after the deadline. Lextran reserves the right to cancel or reissue this RFP, or to reject, in whole or in part, any and all submissions received in response to this RFP should Lextran determine that the responses received are unsatisfactory or that such cancellation or rejection is in the best interest of Lextran. Lextran further reserves the right to waive any minor technical deficiency or irregularity in a submission package. The determination of the selection criteria and the process for evaluating the proposal shall be in the sole and absolute discretion of Lextran. Lextran also reserves the right to require of each/any Proposer, information regarding financial responsibility and viability or such other information as Lextran determines is necessary to ascertain whether a proposal is in fact a responsible proposal. Lextran reserves the right to publicly post bid tabulations containing vendor prices.BackgroundLextran, the Transit Authority of Lexington-Fayette Urban County Government, was established as it is known today in 1973 by the Commonwealth of Kentucky as a Mass Transportation Authority. Our mission “We serve people and our community with mobility solutions” is accomplished by focusing on three key pillars: Deliver high quality product and service, Demonstrate value to the community, and Manage and sustain resources.Lextran provides 3.7 million trips annually with service to residents and visitors of Lexington-Fayette County on 25 fixed routes, and county-wide paratransit seven days a week, 365 days a year. With an annual combined operating and capital budget of $48 million, Lextran operates from a LEED certified headquarters employing over 200 team members with a 118-vehicle fleet for both fixed route and paratransit, including compressed natural gas, zero emission battery electric, diesel and gasoline powered vehicles.TimelineRelease Project Date:February 27, 2026Pre-Proposal Meeting (Non-Mandatory):March 16, 2026, 1:30pm AgendaLextran – Zoom https://us02web.zoom.us/j/88089894286?pwd=Fw8KLLwl2Ln1lYMv2CSlWa4Adp6UVo.1Meeting Number: 880 8989 4286 Meeting Password: 236424 Join by Phone: 1(312)535-8110Question Submission Deadline:March 20, 2026, 11:30pmResponse to Questions:April 3, 2026Proposal Submission Deadline:April 29, 2026, 2:00pmContractor Award Date:May 27, 2026Expected Contract Start Date:September 1, 2026

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.