Skip to content
City of Farmington Hills

Use of Opioid Settlement Funds Proposals

Solicitation: Not available
Notice ID: 8e1c2b1b8642264f1bfa9bf67b8640f6
DepartmentCity of Farmington HillsStateMIPostedMar 06, 2026, 12:00 AM UTCDueApr 01, 2026, 12:00 AM UTCCloses in 18 days

Federal opportunity from City of Farmington Hills. Place of performance: MI. Response deadline: Apr 01, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$749,153,672
Sector total $749,153,672 • Share 100.0%
Live
Median
$191,909
P10–P90
$26,352$2,547,835
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($749,153,672)
Deal sizing
$191,909 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
MI, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MI20260028 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Michigan • Lapeer, Livingston, Macomb +1
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $40.74Fringe $32.59
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $40.00Fringe $23.65
+55 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 55 more rate previews.
Davis-BaconBest fitstate match
MI20260028 (Rev 1)
Open WD
Published Jan 23, 2026Michigan • Lapeer, Livingston, Macomb +1
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $40.74Fringe $32.59
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $40.00Fringe $23.65
Rate
TILE SETTER
Base $40.53Fringe $23.62
+54 more occupation rates in this WD
Davis-Baconstate match
MI20260151 (Rev 1)
Open WD
Published Jan 23, 2026Michigan • Shiawassee
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $40.00Fringe $23.65
Rate
BOILERMAKER
Base $43.50Fringe $37.64
Rate
BRICKLAYER
Base $38.00Fringe $26.49
+35 more occupation rates in this WD
Davis-Baconstate match
MI20260067 (Rev 1)
Open WD
Published Jan 23, 2026Michigan • Muskegon
Rate
CARPENTER, Includes Form Work
Base $31.50Fringe $21.15
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $45.98Fringe $25.25
Rate
GROUP 2
Base $41.25Fringe $25.25
+25 more occupation rates in this WD
Davis-Baconstate match
MI20260013 (Rev 1)
Open WD
Published Jan 23, 2026Michigan • Genesee
Rate
CARPENTER
Base $36.46Fringe $23.69
Rate
ELECTRICIAN
Base $35.62Fringe $22.03
Rate
OPERATOR: Power Equipment GROUP 1
Base $48.98Fringe $25.25
+15 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Farmington Hills
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

rfp-fh-25-26-2538 - Use of Opioid Settlement Funds Proposals postdate:- 03/06/2026 responsedate:- 04/01/2026 10:00 AM EDT Solicitation Number:- rfp-fh-25-26-2538 to solicitation details & future business opportunities.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.