Skip to content
Southern Regional Technical College

Building 800 Renovation - Bainbridge Campus

Solicitation: Not available
Notice ID: 8a5dac0d1a4f60fd3871b6caa116380a
DepartmentSouthern Regional Technical CollegeStateGAPostedMar 04, 2026, 12:00 AM UTCDueApr 09, 2026, 06:00 PM UTCCloses in 34 days

Federal opportunity from Southern Regional Technical College. Place of performance: GA. Response deadline: Apr 09, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,171,531,498
Sector total $1,171,531,498 • Share 100.0%
Live
Median
$146,983
P10–P90
$30,426$1,364,479
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,171,531,498)
Deal sizing
$146,983 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Georgia
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
GA20260303 (Rev 0)
Match signal: state matchOpen WD
Published Jan 23, 2026Georgia • Clayton
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $33.90Fringe $18.80
Rate
MILLWRIGHT
Base $31.58Fringe $17.05
+26 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 26 more rate previews.
Davis-BaconBest fitstate match
GA20260303 (Rev 0)
Open WD
Published Jan 23, 2026Georgia • Clayton
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $33.90Fringe $18.80
Rate
MILLWRIGHT
Base $31.58Fringe $17.05
Rate
OPERATOR: Backhoe/Excavator/Trackhoe
Base $28.32Fringe $13.45
+25 more occupation rates in this WD
Davis-Baconstate match
GA20260319 (Rev 0)
Open WD
Published Jan 23, 2026Georgia • Catoosa, Dade, Walker
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.24Fringe $18.54
Rate
ELECTRICIAN
Base $35.35Fringe $14.63
Rate
OPERATOR: Crane
Base $38.53Fringe $16.08
+19 more occupation rates in this WD
Davis-Baconstate match
GA20260324 (Rev 0)
Open WD
Published Jan 23, 2026Georgia • Murray, Whitfield
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.24Fringe $18.54
Rate
ELECTRICIAN
Base $35.35Fringe $14.63
Rate
OPERATOR: Crane
Base $38.53Fringe $16.08
+19 more occupation rates in this WD
Davis-Baconstate match
GA20260085 (Rev 0)
Open WD
Published Jan 23, 2026Georgia • Ben Hill
Rate
BOILERMAKER
Base $34.21Fringe $23.92
Rate
POWER EQUIPMENT OPERATOR: Crane (over 10 tons)
Base $32.00Fringe $17.70
Rate
Crane (over 120 tons)
Base $33.00Fringe $17.70
+18 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Southern Regional Technical College
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Description

Building 800 Renovation - Bainbridge Campus

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.