Skip to content
State of Utah

DFCM Construction - VBS Construction Stage II - Invitation to Bid - OWTC - Pathway Building - Project #25292240

Solicitation: MP26025-Stage II
Notice ID: 870ef3c44c99aac011a714c13c2dc566
DepartmentState of UtahStateUTPostedFeb 25, 2026, 12:00 AM UTCDueMar 24, 2026, 12:00 AM UTCCloses in 22 days

Federal opportunity from State of Utah. Place of performance: UT. Response deadline: Mar 24, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$69,940,410,012
Sector total $69,940,410,012 • Share 100.0%
Live
Median
$350,000
P10–P90
$29,356$12,502,188
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($69,940,410,012)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
UT, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 02, 2026
Utah • Washington
Match signal: state match
Published Jan 02, 2026
Utah • Sanpete
Match signal: state match
Published Jan 02, 2026
Utah • Emery, Kane, Millard +2
Match signal: state match

Point of Contact

Not available

Agency & Office

Department
State of Utah
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

INVITATION TO BID This solicitation is Stage II: Invitation to Bid of a multistage selection process for construction services. Only Contractors short listed by the Selection Committee during the Stage I: Request for Proposals process for this project are invited to bid during this stage of the selection process. Project Description:The Pathway Building provides high-quality education and one-stop services for the student body. With flexible classroom space, study rooms, consolidated student services, a testing center, new campus store, and campus grill, the new building will improve prospective and current student's educational experiences. **Construction Cost Estimate: **$66,800,000.00

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.