Skip to content
Washington County Water Conservancy District

Invitation for Bids: Quail Creek Water Treatment Plant (QCWTP) 90 mgd Expansion and Ozone Addition – Phase 3

Solicitation: Not available
Notice ID: 86991c7a18363e751b79f2e0ad34f9d8
DepartmentWashington County Water Conservancy DistrictStateUTPostedMar 31, 2026, 12:00 AM UTCDueMay 21, 2026, 12:00 AM UTCCloses in 42 days

Federal opportunity from Washington County Water Conservancy District. Place of performance: UT. Response deadline: May 21, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,205,695,420
Sector total $7,205,695,420 • Share 100.0%
Live
Median
$96,720
P10–P90
$28,298$2,037,759
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,205,695,420)
Deal sizing
$96,720 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
UT, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
UT20260021 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Utah • Rich
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
+35 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 35 more rate previews.
Davis-BaconBest fitstate match
UT20260021 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Rich
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
Rate
TRUCK DRIVER (Dump Truck, Bottom-end or side) Less than 8 cu. yds
Base $29.37Fringe $14.65
+34 more occupation rates in this WD
Davis-Baconstate match
UT20260025 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Daggett
Rate
TRUCK DRIVER (Articulated)
Base $32.14Fringe $14.65
Rate
TRUCK DRIVER (Concrete Pumping)
Base $29.62Fringe $14.65
Rate
TRUCK DRIVER (Dump Truck, Bottom-end or side) Less than 8 cu. yds
Base $29.37Fringe $14.65
+34 more occupation rates in this WD
Davis-Baconstate match
UT20260104 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Box Elder
Rate
CARPENTER, Includes Form Work
Base $22.84Fringe $4.64
Rate
CEMENT MASON/CONCRETE FINISHER
Base $21.19Fringe $6.82
Rate
ELECTRICIAN, Includes Low Voltage Wiring
Base $32.24Fringe $7.85
+31 more occupation rates in this WD
Davis-Baconstate match
UT20260086 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Tooele
Rate
CARPENTER (Drywall Hanging and Metal Stud Installation Only)
Base $31.66Fringe $13.97
Rate
ELEVATOR MECHANIC
Base $55.43Fringe $38.43
Rate
DRYWALL FINISHER/TAPER
Base $26.00Fringe $8.78
+23 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Washington County Water Conservancy District
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

PUBLIC NOTICE OF INVITATION FOR BIDS FOR Quail Creek Water Treatment Plant 90 mgd Expansionand Ozone Addition – Phase 3 The Washington County Water Conservancy District (WCWCD) is issuing an Invitation for Bids for Quail Creek Water Treatment Plant (QCWTP) 90 mgd Expansion and Ozone Addition – Phase 3 (Project). A copy of the Invitation for Bids is available at: www.wcwcd.gov/procurement/. Project details: This project is a 35-mgd expansion of the existing facility for a total net plant capacity of 90 mgd with a new 90-mgd ozone facility. Project location: 270 N 5300 W, Hurricane, UT (approximately 10 miles northeast of St. George, Utah) Scope of work:Modifications to the existing Flow Control Building for increased plant flows, addition of a new Ozone Facility with three ozone contactors, an ozone generation and feed system, a hydrogen peroxide storage and feed system, an onsite liquid oxygen (LOX) storage, and associated yard piping. The Project also includes addition of a new Dissolved Air Flotation over Filters (DAFF) Facility including a new pumped flash mix system, seven DAFF basins, DAF equipment, and associated yard piping. A structural enclosure over the DAFF basins is included as part of the Project base bid with an optional structural enclosure over the new flocculation area included as Bid Alternate F. The Project also includes addition of a new ultraviolet (UV) disinfection system consisting of three medium pressure UV reactors and associated new valves, piping, and analyzers as required in the existing UV building (Bid Alternate D). Work also includes modifications to the existing Bulk Chemical and Chemical Feed buildings for modifications to the existing onsite sodium hypochlorite generation system (Base Bid Item A), cationic polymer storage and feed improvements (Base Bid Item B), demolition of the existing powdered activated carbon (PAC) supersack feed system and potassium permanganate storage and feed system (Base Bid Item C), an expansion of the Bulk Chemical Building for a new onsite sodium hypochlorite generation system (Bid Alternate E), and a new anionic polymer storage and feed system in the Chemical Feed Building (Bid Alternate G). Work also includes a remodel of several areas in the existing Filter/Operations Building and civil site and yard piping improvements.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.