Skip to content
Mohave County

Lift Equipment Certification and Load Testing

Solicitation: 2026-027-RFP
Notice ID: 7f14d7114c7a45fd9c712a9911271300
DepartmentMohave CountyStateAZPostedFeb 11, 2026, 12:00 AM UTCDueMar 23, 2026, 12:00 AM UTCCloses in 10 days

Federal opportunity from Mohave County. Place of performance: AZ. Response deadline: Mar 23, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$386,765,285
Sector total $386,765,285 • Share 100.0%
Live
Median
$129,570
P10–P90
$32,637$689,094
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($386,765,285)
Deal sizing
$129,570 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
AZ, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
AZ20260046 (Rev 0)
Match signal: state match • county matchOpen WD
Published Jan 02, 2026Arizona • Mohave
Rate
Carpenter, Excludes Formwork Concrete
Base $35.89Fringe $14.98
Rate
POWER EQUIPMENT OPERATOR: Bulldozer
Base $35.56Fringe $18.12
+44 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 44 more rate previews.
Davis-BaconBest fitstate match • county match
AZ20260046 (Rev 0)
Open WD
Published Jan 02, 2026Arizona • Mohave
Rate
Carpenter, Excludes Formwork Concrete
Base $35.89Fringe $14.98
Rate
POWER EQUIPMENT OPERATOR: Bulldozer
Base $35.56Fringe $18.12
Rate
POWER EQUIPMENT OPERATOR: Paver/Spreader/Finish equipment (asphalt, aggregate, & concrete)
Base $35.56Fringe $18.12
+43 more occupation rates in this WD
Davis-Baconstate match • county match
AZ20260006 (Rev 0)
Open WD
Published Jan 02, 2026Arizona • Maricopa, Mohave, Pima +2
Rate
BOILERMAKER
Base $36.07Fringe $30.59
Rate
BRICKLAYER
Base $25.95Fringe $8.49
Rate
BRICKLAYER
Base $25.31Fringe $8.13
+29 more occupation rates in this WD
Davis-Baconstate match • county match
AZ20260058 (Rev 0)
Open WD
Published Jan 02, 2026Arizona • Mohave
Rate
Electrician
Base $33.00Fringe $21.33
Rate
POWER EQUIPMENT OPERATOR: Oiler
Base $32.29Fringe $18.12
Rate
POWER EQUIPMENT OPERATOR: Field Equipment Serviceperson
Base $35.56Fringe $18.12
+27 more occupation rates in this WD
Davis-Baconstate match • county match
AZ20260043 (Rev 0)
Open WD
Published Jan 02, 2026Arizona • Coconino, Mohave, Yavapai
Rate
BRICKLAYER
Base $32.29Fringe $9.97
Rate
CARPENTER
Base $33.19Fringe $19.20
Rate
ELECTRICIAN
Base $39.09Fringe $15.53
+15 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Mohave County
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

The County of Mohave, on behalf of the Public Works - Fleet Division Department, is seeking proposals from qualified respondents for Lift Equipment Certification and Load Testing. All proposals are due before 2:00 pm on Monday, March 23, 2026. BackgroundMohave County intends to establish an annual requirements contract with a qualified firm to provide testing, certification, and necessary repair services for Mohave County automotive and equipment booms, lifts, and hoists (“Lift Equipment”). All lift equipment shall be tested annually in accordance with applicable safety and regulatory standards.The purpose of these inspections is to ensure that all booms, lifts, hoists, and related lift equipment comply with Arizona Department of Occupational Safety and Health standards and all other applicable safety regulations.TimelineProposal Issue Date:February 11, 2026Pre-Proposal Conference (Non-Mandatory):March 10, 2026, 9:00am Agendavia Microsoft Teams Meeting See Notice of Request for Proposal for Link to JoinQuestion Submission Deadline:March 17, 2026, 5:00pmProposal Due Date:March 23, 2026, 2:00pm

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.