Cumberland Hill Fire Station Repairs
Federal opportunity from Cumberland Fire District • Cumberland Fire District. Place of performance: RI. Response deadline: Mar 10, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
The project consists of the replacement of the elevated concrete slab-on-deck at the Cumberland Hill Fire Station located at 3502 Mendon Road Cumberland, Rhode Island. The project includes, but is not limited to, the demolition and removal of the existing elevated concrete slab-on-deck in the 1950s apparatus bay, demolition and removal of the existing support framing and foundations, and installation of a new cast-in-place elevated concrete deck and support framing. Existing mechanical, electrical, and plumbing utilities located within space are to be protected and reused or replaced in-kind where reuse is not feasible. All work must be completed on or before March 31, 2027. Pre-bid meeting will be held at 3502 Mendon Road Cumberland, RI on Tuesday, February 24, 2026, at 2:00 PM. While not mandatory, the District highly encourages attendance by all potential bidders.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.