Skip to content
Csu

Bid No. SY25002 - Nutwood Ave Pedestrian Bridge (Titan Gateway)

Solicitation: Not available
Notice ID: 7a274938fdaf75ef92e7f34fdc5f4f12
DepartmentCsuAgencyFullertonStateCAPostedFeb 23, 2026, 12:00 AM UTCDueApr 22, 2026, 12:00 AM UTCCloses in 54 days

Federal opportunity from Fullerton • CSU, Fullerton. Place of performance: CA. Response deadline: Apr 22, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$68,699,272,131
Sector total $68,699,272,131 • Share 100.0%
Live
Median
$253,715
P10–P90
$29,763$10,909,709
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($68,699,272,131)
Deal sizing
$253,715 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Orange County
Contracting office
Not listed

Point of Contact

Name
Sally Yassine
Email
syassine@fullerton.edu
Phone
657/278-5492
Name
Sally Yassine
Email
syassine@fullerton.edu
Phone
657/278-5492

Agency & Office

Department
CSU, Fullerton
Agency
Fullerton
Subagency
Fullerton
Office
Not available
Contracting Office Address
Not available

Description

In general, the work consists of constructing a pedestrian bridge spanning a key campus crossing at Nutwood and Commonwealth avenues in order to protect pedestrians and reduce accidents, mitigate neighborhood concerns and improve traffic flow, and reduce vehicle trips and encourage walking and biking. The project includes a new pedestrian bridge structure, placement of retaining walls on CSUF property for approach ramps, cast-in-place abutments founded on pile caps with cast-in-drilled-hole piles, new prefabricated single span truss over Nutwood Avenue. Modifications to medians and striping for College Park building the north parking lot to accommodate bridge structure and fire lane improvement swill also be required, in addition to removal and replacement of City of Fullerton traffic signals for intersection of Nutwood Avenue and Commonwealth Avenue. New landscaping and lighting for bridge structure and intersection will also be included. Additional work includes excavation and backfill for structures, traffic control, and sidewalk repairs for traffic signal relocation. This new bridge is funded by Federal, State (Caltrans), CSUF and County funds and will be located on Nutwood Avenue in Fullerton, CA.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.