Addendum#1: BDC19-25-26 Key Largo Hammock - Valois Canal Plug
Federal opportunity from Department of Environmental Protection. Place of performance: FL. Response deadline: Mar 03, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
<p><strong>February 19, 2026</strong></p><p> </p><p><strong>NOTICE TO APPLICANTS</strong></p><p><strong>ADDENDUM NO. ONE (1)</strong></p><p> </p><p><strong>Dagny Johnson Key Largo Hammock Botanical State Park - Valois Canal Plug</strong></p><p><strong>DEP BID NO. BDC19-25/26</strong></p><p> </p><p> TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.</p><h3>NOTICE</h3><p> </p><p>It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Alisha Sadler, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.</p><p> </p><p>_______________________________________</p><p>Signature of Contractor and Date</p><p> </p><p><strong>The following statements supersede & supplement the corresponding items in the specifications & drawings:</strong></p><p> </p><ol><li><strong>Question: </strong>General Note 6.1, on Sheet CM—1.1, states that proposed rock sources must be approved for use by the engineer prior to commencement of work. Is there a pre-approved list of sources that are already approved by the engineer? </li></ol><p><strong>Answer: </strong>The rock source needs to meet the requirements on 6.2.</p><p> </p><p><strong>2. Question: </strong> General Note 6, on Sheet CM—1.1, does not specify the type of rock to be used. Is the rock granite, limestone, Cocina, or another type? The type of rock can dramatically increase the costs due to transportation of the material from its source. </p><p><strong>Answer:</strong> The rock physical characteristics are shown in Section 6.2. For example, granite would have a specific gravity greater than the minimum required (minimum requirement for specific gravity is 2.25, granite would be at 2.6 to 2.8 depending on the quarry, this specific gravity is close to that of limestone).</p><p> </p><p>In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.</p>
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.