City of Tyler - 2025 Type D Sanitary Sewer Creek Crossing Repairs / Tyler Bid No. 26-012
Federal opportunity from KSA Engineers Inc. Place of performance: TX. Response deadline: Apr 07, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 43 more rate previews.↓
Point of Contact
Agency & Office
Description
Construction of approximately 3 sanitary sewer reroutes in 3 areas across the City of Tyler including approximately 1,440 linear feet of pipe replacement by open cut, approximately 140 linear feet of steel encasement by open cut, construction of 12 manholes, geopolymer manhole lining, lateral reconnections, pavement repairs, and assoicated gravity sewer appurtenenaces. Calendar Days: 210 Final Completion Liquidated Damages: Refer to Article 16.12.3 of the General Conditions Any addenda issued for this project will ONLY be posted on www.civcastusa.com . Planholders will be notified of any addenda automatically through email if documents were downloaded and email registered with www.civcastusa.com .
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.