Skip to content
Snohomish County PUD

Bid ITB #26-1649-KS - PWC - Jackson U1 & U2 Power Nozzle Rebuild Project (Re-Bid)

Solicitation: 26-1649-KS
Notice ID: 6bb7a4233f3a749a1cd072cd7e1c6fa3
DepartmentSnohomish County PUDStateWAPostedMar 10, 2026, 12:00 AM UTCDueMar 24, 2026, 12:00 AM UTCCloses in 10 days

Federal opportunity from Snohomish County PUD. Place of performance: WA. Response deadline: Mar 24, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$749,153,672
Sector total $749,153,672 • Share 100.0%
Live
Median
$191,909
P10–P90
$26,352$2,547,835
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($749,153,672)
Deal sizing
$191,909 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
WA, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
WA20260114 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Washington • Spokane
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $75.37Fringe $18.82
Rate
TILE FINISHER
Base $27.26Fringe $11.99
+42 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 42 more rate previews.
Davis-BaconBest fitstate match
WA20260114 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Spokane
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $75.37Fringe $18.82
Rate
TILE FINISHER
Base $27.26Fringe $11.99
Rate
TILE SETTER
Base $36.35Fringe $14.57
+41 more occupation rates in this WD
Davis-Baconstate match
WA20260138 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Columbia, Franklin
Rate
CARPENTER
Base $44.21Fringe $17.28
Rate
Line Construction: LINE PERSON
Base $64.17Fringe $23.58
Rate
TREE TRIMMER: Ground Person
Base $22.60Fringe $16.37
+39 more occupation rates in this WD
Davis-Baconstate match
WA20260021 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Adams
Rate
BRICKLAYER
Base $33.95Fringe $19.33
Rate
TILE SETTER
Base $29.86Fringe $13.95
Rate
CARPENTER (Including Drywall Hanging and Form Work)
Base $44.21Fringe $17.28
+28 more occupation rates in this WD
Davis-Baconstate match
WA20260026 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Grant
Rate
BRICKLAYER
Base $33.95Fringe $19.33
Rate
TILE SETTER
Base $29.86Fringe $13.95
Rate
CARPENTER (Including Drywall Hanging and Form Work)
Base $44.21Fringe $17.28
+27 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Snohomish County PUD
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

Engineer's Estimate: $2,325,000.00 Deadline for Questions: Wednesday, March 18, 2026, by 8am and submit to Bids@snopud.com Responses to Questions Posted: on or before Thursday, March 19, 2025, by 4:30pm Project Description: Work Description and Site: Provide all labor, equipment, tools, material and incidentals necessary to rebuild twelve needle valves associated with two 52-MW vertical Pelton turbines, Units 1 and 2, at the Jackson Powerhouse. Work includes removing needle valves, rigging and handling, transporting the needle valves to a rebuild location, and replacing gaskets, O-rings, bushing hardware and necessary machine work and/or other components within the needle valves before reinstalling the needle valves in their original location. Included within this scope are functions such as maintaining a confined space entry program, air-handling, sump-pumps for dewatering, dust-containment, lead-abatement, oil containment, fabrication of special tooling and stands for disassembly and reassembly, and any other items reasonably related to performance of the needle valve rebuilds. In addition to the needle valve work, the work area shall be re-coated upon completion. Alternate work includes ancillary work on the associated cooling water system and Pelton turbines. The location of the work is at 31411 116 th St. SE, near the city of Sultan, WA, in Snohomish County. All requests for clarification or additional information regarding this ITB must be submitted to the District via e-mail to bids@snopud.com . The District will not guarantee responses to questions received via other forms of communication (phone, voicemail, text, IM, etc.). Do not submit questions via Public Purchase.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.