Skip to content
Dept of Corrections & Rehab

C5613219-D Ironwood State Prison New Potable Water Wells Project

Solicitation: Not available
Notice ID: 6b2a18000bebcb773a78a81e16be40d0
DepartmentDept of Corrections & RehabStateCAPostedFeb 23, 2026, 12:00 AM UTCDueMay 06, 2026, 06:00 PM UTCCloses in 71 days

Federal opportunity from Dept of Corrections & Rehab. Place of performance: CA. Response deadline: May 06, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$1,637,311,008
Sector total $1,637,311,008 • Share 100.0%
Live
Median
$258,930
P10–P90
$28,038$7,452,470
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,637,311,008)
Deal sizing
$258,930 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Riverside County
Contracting office
Not listed

Point of Contact

Name
Monique Stephens
Email
monique.stephens@cdcr.ca.gov
Phone
916/255-6199
Name
Monique Stephens
Email
monique.stephens@cdcr.ca.gov
Phone
916/255-6199

Agency & Office

Department
Dept of Corrections & Rehab
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Description

In general, The Ironwood State Prison (ISP) New Potable Water Wells Project (NPWW) located in Blythe, California, is to replace two aging wells by constructing two NPWW, 1R and 5R. The replacement wells, 1R and 5R will be installed adjacent to two existing out-of-service wells that have been previously abandoned. The wells will be equipped and connected to the existing raw water transmission line that conveys water to the on-site water treatment plant (WTP). Electrical improvements include replacing the existing motor control centers and transformers, and installation of new conduit from the new well sites to the WTP control center building. Additionally, work will include installation of new pumps, canopies, motors, piping, valves, electrical and communication to the Supervisory Control and Data Acquisition (SCADA) system.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.