DFCM Construction - Standard Low Bid - Southern Utah University- SUU Stadium Seating & Concrete Repairs- Project #26056730
Federal opportunity from State of Utah. Place of performance: UT. Response deadline: Mar 19, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
Description
INVITATION TO BID The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the referenced project: Project Description: Project includes pressure grouting to fill voids between supporting soil & existing concrete bleachers; replace aluminum brackets that support the bleachers and anchor to the concrete; remove & replace delaminated and crumbling concrete of bleachers.; remove existing coating on concrete bleachers & replace with polyurethane traffic bearing membrane; install new sidewalk and stairs; remove and replace concrete flat work, typically sidewalk. Construction Cost Estimate: $519,867.00
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.