AMRP Rupp Run S Manor Twshp Armstrong Cnty
Federal opportunity from Department of Environmental Protection. Place of performance: PA. Response deadline: Jan 08, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Principal Items of Work and Approximate Quantities are:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 Each
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (12” Diameter) - 50 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tube – 20 L.F.
Clearing and Grubbing, 0.1 Acre
Planting – Planting Preparation, 0.2 Acre
Channel Reconstruction – R-6 Riprap and Rock Energy Dissipaters, 200 L.F.
Channel Reconstruction – SmartDitch, 175 L.F.
Traffic Control, 1 L.S.
Beginning on the Issue Date, free copies of Bid Documents can be obtained by going to www.BidExpress.com, PA Department of environmental Protection.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.