Skip to content
Public Agency

Recirculating Aquaculture System Upgrades

Solicitation: Not available
Notice ID: 667d56f08c4fea0a99ceca2100a18ebc
DepartmentPublic AgencyStateMDPostedDueNo due date posted

Federal opportunity from Public Agency. Place of performance: MD.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$903,760,926
Sector total $903,760,926 • Share 100.0%
Live
Median
$191,909
P10–P90
$26,352$2,550,765
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($903,760,926)
Deal sizing
$191,909 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
MD, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MD20260082 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Maryland • Anne Arundel
Rate
BALANCING TECHNICIAN
Base $47.92Fringe $24.44
Rate
BRICKLAYER
Base $37.50Fringe $14.78
+84 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 84 more rate previews.
Davis-BaconBest fitstate match
MD20260082 (Rev 0)
Open WD
Published Jan 02, 2026Maryland • Anne Arundel
Rate
BALANCING TECHNICIAN
Base $47.92Fringe $24.44
Rate
BRICKLAYER
Base $37.50Fringe $14.78
Rate
CARPENTER
Base $34.41Fringe $14.49
+83 more occupation rates in this WD
Davis-Baconstate match
MD20260120 (Rev 0)
Open WD
Published Jan 02, 2026Maryland • Montgomery
Rate
BALANCING TECHNICIAN
Base $47.92Fringe $24.44
Rate
BRICKLAYER
Base $37.50Fringe $14.78
Rate
CARPENTER
Base $34.41Fringe $14.49
+77 more occupation rates in this WD
Davis-Baconstate match
MD20260041 (Rev 0)
Open WD
Published Jan 02, 2026Maryland • Howard
Rate
BRICKLAYER
Base $37.50Fringe $14.78
Rate
CARPENTER
Base $34.41Fringe $14.49
Rate
CARPENTER-SHORING SCAFFOLD BUILDER
Base $34.41Fringe $14.49
+59 more occupation rates in this WD
Davis-Baconstate match
MD20260061 (Rev 0)
Open WD
Published Jan 02, 2026Maryland • Baltimore City
Rate
FLOOR LAYER: Carpet
Base $34.12Fringe $14.64
Rate
BRICKLAYER (Insulator Foam)
Base $21.60Fringe $0.00
Rate
CARPENTER, Excludes Drywall Hanging, and Metal Stud Installation
Base $19.41Fringe $3.11
+14 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Public Agency
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

Recirculating Aquaculture System Upgrades

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 15, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The opportunity involves upgrades to a Recirculating Aquaculture System for a Public Agency. This initiative aims to enhance current aquaculture technologies to improve efficiency and sustainability. Specific details regarding the scope, including requirements or technical specifications, are currently unavailable.

aquaculturesystem upgradessustainabilityrecirculating systems
What the buyer is trying to do

The buyer is focused on upgrading existing Recirculating Aquaculture Systems to optimize performance and potentially expand production capabilities.

Who should pursue this
  • Companies specializing in aquaculture technology
  • Contractors with experience in system upgrades
  • Firms with expertise in sustainable practices and environmental compliance
Work breakdown
No work breakdown extracted.
Response package checklist
  • Company qualifications and relevant projects
  • Technical approach to system upgrades
  • Sustainability practices and certifications
  • Pricing structure including potential discounts
Compliance notes
No compliance notes extracted.
Pricing strategy
  • Consider offering tiered pricing for different levels of upgrades.
  • Highlight any relevant warranties or support services in pricing.
Teaming and subs
No teaming notes extracted.
Risks and watchouts
  • Lack of detailed project scope may lead to misinterpretation of requirements.
  • Potential delays in clarifying specifications from the buyer.
Smart questions to ask
  • What specific upgrades or improvements are being prioritized?
  • Are there any existing constraints or challenges with the current system?
  • What is the expected timeline for project completion?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No solicitation number provided
  • No response deadline specified
  • No specifics on the nature of the upgrades
  • No details on budget or funding
  • Lack of performance period information
  • No contact information for the buyer
  • No associated resource links or attachments
  • No identified evaluation criteria

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.