Skip to content
Public Agency

Sources Sought for Manufacture of a Forged and Machined HY 80 Pedestal

Solicitation: Not available
Notice ID: 5d4a297b6058fce54fab9c2ffc712d86
DepartmentPublic AgencyStateMDPostedDueNo due date posted

Federal opportunity from Public Agency. Place of performance: MD.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$903,760,926
Sector total $903,760,926 • Share 100.0%
Live
Median
$191,909
P10–P90
$26,352$2,550,765
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($903,760,926)
Deal sizing
$191,909 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
MD, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MD20260082 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Maryland • Anne Arundel
Rate
BALANCING TECHNICIAN
Base $47.92Fringe $24.44
Rate
BRICKLAYER
Base $37.50Fringe $14.78
+84 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 84 more rate previews.
Davis-BaconBest fitstate match
MD20260082 (Rev 0)
Open WD
Published Jan 02, 2026Maryland • Anne Arundel
Rate
BALANCING TECHNICIAN
Base $47.92Fringe $24.44
Rate
BRICKLAYER
Base $37.50Fringe $14.78
Rate
CARPENTER
Base $34.41Fringe $14.49
+83 more occupation rates in this WD
Davis-Baconstate match
MD20260120 (Rev 0)
Open WD
Published Jan 02, 2026Maryland • Montgomery
Rate
BALANCING TECHNICIAN
Base $47.92Fringe $24.44
Rate
BRICKLAYER
Base $37.50Fringe $14.78
Rate
CARPENTER
Base $34.41Fringe $14.49
+77 more occupation rates in this WD
Davis-Baconstate match
MD20260041 (Rev 0)
Open WD
Published Jan 02, 2026Maryland • Howard
Rate
BRICKLAYER
Base $37.50Fringe $14.78
Rate
CARPENTER
Base $34.41Fringe $14.49
Rate
CARPENTER-SHORING SCAFFOLD BUILDER
Base $34.41Fringe $14.49
+59 more occupation rates in this WD
Davis-Baconstate match
MD20260061 (Rev 0)
Open WD
Published Jan 02, 2026Maryland • Baltimore City
Rate
FLOOR LAYER: Carpet
Base $34.12Fringe $14.64
Rate
BRICKLAYER (Insulator Foam)
Base $21.60Fringe $0.00
Rate
CARPENTER, Excludes Drywall Hanging, and Metal Stud Installation
Base $19.41Fringe $3.11
+14 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Public Agency
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

Sources Sought for Manufacture of a Forged and Machined HY 80 Pedestal

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 15, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

This sources sought notice seeks manufacturers capable of producing a forged and machined HY 80 pedestal, which is essential for specific defense applications. The public agency is gauging interest and capabilities in the market prior to potential solicitations. Key information regarding the expected timeline and budget is not provided, indicating an early stage in the acquisition process.

HY 80 pedestalforging and machiningdefense manufacturingsources sought
What the buyer is trying to do

The buyer is seeking to identify capable manufacturers for the production of a forged and machined HY 80 pedestal, which may lead to a future procurement opportunity.

Who should pursue this
  • Manufacturers with experience in forging and machining steel
  • Companies with appropriate industry certifications
Work breakdown
  • Identify potential manufacturers
  • Assess capabilities for forging and machining HY 80 material
  • Evaluate interested vendors' experience in similar projects
Response package checklist
  • Company profile including relevant experience
  • Technical capabilities and certifications
  • Previous project examples of similar work
Compliance notes
  • Adherence to defense manufacturing standards
  • Ability to meet quality assurance specifications
Pricing strategy
  • Flexibility in pricing based on potential volume
  • Consideration of material costs for HY 80
Teaming and subs
  • Consider partnerships with firms specializing in machining or forging that may enhance capability and capacity
Risks and watchouts
  • No specified response deadline may lead to uncertainty in planning
  • Lack of detailed requirements makes it challenging to estimate production feasibility
Smart questions to ask
  • What are the anticipated volumes for the forged and machined pedestals?
  • Are there any specific compliance requirements for the manufacturing process?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed specifications for the pedestal are not provided.
  • Response deadline is unspecified.
  • No budget or estimated funding amount is indicated.
  • Clarification on certification requirements for bidders is missing.
  • Information about the procurement timeline is lacking.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.