Skip to content
Department of Transportation

Construction of New Airport Traffic Control Tower (ATCT) - Grand Forks, ND

Solicitation: 697DCK-26-R-00034
Notice ID: 5d398322027fd3c765bdf6fe9856e910
DepartmentDepartment of TransportationStateNDPostedFeb 18, 2026, 12:00 AM UTCDueMar 23, 2026, 04:00 AM UTCCloses in 22 days

Federal opportunity from TRANSPORTATION, DEPARTMENT OF. Place of performance: ND. Response deadline: Mar 23, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$69,940,403,012
Sector total $69,940,403,012 • Share 100.0%
Live
Median
$350,000
P10–P90
$29,356$12,502,188
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($69,940,403,012)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
ND, US
State: US
Contracting office
Not listed

Incumbent & Expiration Tracking

Incumbent
Not available
Data source
Not detected
Contract expiration
Not available
No expiration data
Capture records and source attachments to track incumbent rollover timing.

Competitive Heat Score

Bid pressure estimate
52/100
Medium

Moderate competition signal. Standard qualification and pricing discipline should hold.

  • Deadline runway: 22 days remaining.
  • Competition pool: Open competition (no set-aside detected).

Point of Contact

Not available

Agency & Office

Department
TRANSPORTATION, DEPARTMENT OF
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

AMENDMENT 01 - Extends the the deadline for submission of questions and the proposal due date. All other terms and conditions remain unchanged. See the attached amendment for the revised dates. The Federal Aviation Administration (FAA) has a requirement to build a new Airport Traffic Control Tower (ATCT) and Base Building at the Grand Forks International Airport in Grand Forks, ND. This solicitation is posted in accordance with FAA Acquisition Management Policy Section 3.2.1.3.11 Public Announcement. Review all attachments pertaining to this solicitation prior to submitting a proposal. This announcement is not intended to guarantee procurement of the services and shall not be construed as a commitment by the Government to enter into a contract. The Government is not liable for costs associated with the preparation, submittal of inquiries or responses to this announcement and will not reimburse any vendors for cost incurred in responding to this public announcement.The file sizes for the following attachments are too large to upload. To receive the attachments below please email your request to Erin.M.Crabtree@faa.gov.Attach ment J-1 Statement of WorkAttachment J-2 Specifications - Division IAttachment J-2 Specifications - Division IIAttachment J-2a Drawings

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.