Community Center Second Floor Bathroom Addition
Federal opportunity from City of Fruita. Place of performance: CO. Response deadline: May 04, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 95 more rate previews.↓
Point of Contact
Agency & Office
Description
The City of Fruita is requesting proposals from qualified contractors for the design and construction of a single American with Disabilities Act of 1990 as enacted and amended from time to time (“ADA”) accessible restroom on the second floor of the Fruita Community Center (FCC). ). The restroom will be located within the existing fitness studio storage room. As part of this project, the fitness studio storage area will be reconfigured to accommodate the new restroom, including the installation of new double doors to provide appropriate access to the redesigned storage space.A mandatory Pre-Proposal walkthrough of the Community Center and Project (defined below) area will be conducted by City and held for prospective Offerors on Tuesday, March 24, 2026, at 10:30 a.m. (MDT) at the Community Center located at 324 N. Coulson Street, Fruita, Colorado 81521. Offerors acknowledge and understand the obligation to attend such walkthrough before submitting a Proposal.Proposals must be submitted and received by City on or before 2:30 PM on May 4, 2026. Electronic Proposals will be accepted through ’s Rocky Mountain E-Purchasing System (“RMEPS”). https://www. .com/colorado. (City does not have access to or control over the vendor side of RMEPS, and City makes no representation or warranty concerning the operability or accessibility of RMEPS. If website accessibility or operability or other problems with RMEPS arise during Proposal submission, the Offerors MUST contact to resolve the issue prior to the Submission Deadline. The Submission Deadline will not be changed or extended due to any issues or problems with Proposal submission, through RMEPS or otherwise. Should any such issues or problems arise, contact at 800-835-4603.)
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.