Addendum 5 BDC18-25/26 Manatee Springs - Connect to the Municipalities
Federal opportunity from Department of Environmental Protection. Place of performance: FL. Response deadline: Mar 24, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 27 more rate previews.↓
Point of Contact
Agency & Office
Description
<p><strong>March 13, 2026</strong></p><p> </p><p><strong>NOTICE TO APPLICANTS</strong></p><p><strong>ADDENDUM NO. FIVE (5)</strong></p><p> </p><p><strong>Manatee Springs State Park - Connect to the Municipalities</strong></p><p><strong>DEP BID NO. BDC18-25/26</strong></p><p> </p><p> </p><p> TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.</p><p> </p><h3>NOTICE</h3><p> </p><p>It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Logan Lee-Marple, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.</p><p> </p><p>_______________________________________</p><p>Signature of Contractor and Date</p><p> </p><p><strong>The following statements supersede & supplement the corresponding items in the specifications & drawings:</strong></p><p> </p><ol><li><strong>Question: </strong>We have been running into an issue with the current design of the wet well. Our equipment suppliers are concerned that the KSB Amamix Mixer is incorrectly specified. The plans indicate a single-phase version of the C2222/XDG however this mixer only comes in a 3-Phase configuration. The other concern is that this mixer is far too large for such a small wet well, the equipment supplier states they would need a minimum of 72” diameter while this wet well only specifies 48”. This could result in some serious cavitation, damaging the propeller, creating too much air and throwing water too abruptly throughout this system. Would you allow a different set-up provided by the manufacturer that would better fit this application? </li></ol><p> </p><p><strong>Answer: </strong>Regarding the concern that the KSB Amamix mixer requires three-phase power while only single-phase power is currently provided: a micro-drive shall be installed to convert the available single-phase supply, allowing the mixer to operate properly within the system. The KSB Amamix mixer remains the correct unit specified for this design.</p><p> </p><p>Regarding the concern that the KSB Amamix mixer may be too large for the designed wet well: this configuration was reviewed between the design team and the supplier. Per the supplier, this arrangement has been successfully implemented on numerous projects with similar wet well dimensions. Based on this information, it is Hydra’s understanding that the proposed mixer will not cause the issues that were of concern.</p><p> </p><p>The specified ZSGV pump may be substituted with the ZOGV model, which is suitable for single-phase power. This substitution can be evaluated during the shop drawing review.</p><p> </p><p>Overall, the concerns raised are appreciated and have been carefully reviewed with the design team and the supplier. Equipment selections and any proposed alternatives can be further reviewed during the shop drawing phase.</p><p> </p><p> </p><p><strong>The bid submittal due date and bid posting date for this project have been postponed:</strong></p><p> </p><p><strong>BID SUBMITTAL DUE DATE</strong>: No later than <strong>3:30 PM (ET), Tuesday, March 24, 2026, </strong>to the below address: Florida Department of Environmental Protection, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000, Attention: Logan Lee-Marple, Contracts Specialist, Bureau of Design and Construction, (850) 245-2519. (For hand delivery: Carr Building, Welcome Desk.) The Department reserves the right to reject any or all bids.</p><p> </p><p><strong>BID POSTING DATE</strong>: No later than <strong>3:30 PM (ET), Tuesday, March 31, 2026,</strong> unless extended by the Department for good cause.</p><p> </p><p> </p><p> </p><p>In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.</p>
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.