Addendum 1 BDC18-25/26 Manatee Springs - Connect to the Municipalities
Federal opportunity from Department of Environmental Protection. Place of performance: FL. Response deadline: Mar 03, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
<p><strong>February 4, 2026</strong></p><p> </p><p><strong>NOTICE TO APPLICANTS</strong></p><p><strong>ADDENDUM NO. ONE (1)</strong></p><p> </p><p><strong>Manatee Springs State Park - Connect to the Municipalities</strong></p><p><strong>DEP BID NO. BDC18-25/26</strong></p><p> </p><p> </p><p> TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.</p><p> </p><h3>NOTICE</h3><p> </p><p>It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Logan Lee-Marple, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.</p><p> </p><p>_______________________________________</p><p>Signature of Contractor and Date</p><p> </p><p><strong>The following statements supersede & supplement the corresponding items in the specifications & drawings:</strong></p><p> </p><p>The septic report, permits and revised plans are hereby incorporated into the bid package and supersede those originally posted with the bid documents. The revised bid package can be found at (<a href="https://publicfiles.dep.state.fl.us/DRP/BDC/BDC%20Public%20Files%20FY25-26/BDC18-25-26_Manatee_Springs_-_Connect_to_the_Municipalities/">https://publicfiles.dep.state.fl.us/DRP/BDC/BDC%20Public%20Files%20FY25-26/BDC18-25-26_Manatee_Springs_-_Connect_to_the_Municipalities/</a>). Please contact the Bureau of Design and Construction’s Contracts Section at <a href="mailto:Logan.LeeMarple@FloridaDEP.gov">Logan.LeeMarple@FloridaDEP.gov</a> with any questions.</p><p> </p><ol><li><strong>Question: </strong>Just for some clarification of the permits in that document list, the permitted drain field sizes do not match the appropriate flow rate for the sizing of the aerobic units. Is it possible that the tank sizes are sized for standard septic tank sizes rather than aerobic units? I.e. the permit for the assistant park ranger residence based on the drain field is sized for a 300GPD flow rate in sandy clay loam. If that’s the case the tank sizes would be incorrect. I just</li></ol><p>wanted to clarify that before working on submitting a bid. </p><p> </p><p><strong>Answer: </strong>The consultant has contacted Levy County and completed the</p><p>necessary steps to update the permits to reflect the designed system</p><p>sizing. Please see the updated permits along with the revised</p><p>plans, at <a href="https://publicfiles.dep.state.fl.us/DRP/BDC/BDC%20Public%20Files%20FY25-26/BDC18-25-26_Manatee_Springs_-_Connect_to_the_Municipalities/">https://publicfiles.dep.state.fl.us/DRP/BDC/BDC%20Public%20Files%20FY25-26/BDC18-25-26_Manatee_Springs_-_Connect_to_the_Municipalities/</a>.</p><p>The plans for the Assistant Park Manager’s Residence now include</p><p>the following revisions:</p><p>1. Additional demolition of a 13" DBH tree (Sheet C110)</p><p>2. Addition of 10 LF of sediment control fence (Sheet C110)</p><p>3. Drain field sizing revisions (Sheets C111 and C112)</p><p>4. Grading revisions (Sheet C113).</p><p> </p><p> </p><p>In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.</p>
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.